The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA DI GEDUNG KPA UNIVERSITAS SRIWIJAYA ON-GRID DENGAN SISTEM TRANSMISI EXISTING PLN

Skripsi

PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA DI GEDUNG KPA UNIVERSITAS SRIWIJAYA ON-GRID DENGAN SISTEM TRANSMISI EXISTING PLN

PARULIAN, YULIANTO - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

High number need of electricity consumption of KPA Building Sriwijaya University, Campus Indralaya, it cause monthly bill goes high too. We need to solve it, without lowered the number of electricity consumption of KPA building. According to vanshdeep parmar’s thesis, if assumed PV solar power plant has 25 year life time, the investment will meet BEP at 13th year, so we have 12 year free energy use. One piece of solar pv panel (Polycrystalline) can produce 7,971 kWh per year for Ogan Ilir state. After the planning done, we concluded, the solar power plant can produce 10 percent need demand of electricity for KPA building, the solar power plant must have the following component, 300 pieces of solar pv panel (polycrystalline) the capacity was 100 wp per panel, so the total capacity of power plant was 30 kWp, one grid-tied solar inverter, the capacity was 40 kWp, one set combiner box, one set AC breaker panels. And we estimated, economic benefit for the use of this power plant, we reduced monthly electricity bill with Rp. 1.752.910 per month, for 25 years use of solar power plant, with net profit was Rp.621.660/month, for 25 years.


Availability
Inventory Code Barcode Call Number Location Status
2007001383T39993T399932020Central Library (REFERENSI)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T399932020
Publisher
Inderalaya : Fakultas Teknik Universitas Sriwijaya., 2020
Collation
100 hlm.; ilus., tab.: 28 cm
Language
Indonesia
ISBN/ISSN
-
Classification
629.07
Content Type
-
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Teknik elektro
PLTS On-Grid
Specific Detail Info
-
Statement of Responsibility
EM
Other version/related

No other version available

File Attachment
  • PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA DI GEDUNG KPA UNIVERSITAS SRIWIJAYA ON-GRID DENGAN SISTEM TRANSMISI EXISTING PLN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search