Skripsi
ANALISA SIMULASI PEMISAHAN BEBAN BERDASARKAN PENINGKATAN FLUKTUASI BEBAN DI SUBSISTEM 150KV
Very fast load fluctuation conditions must be anticipated with the availability of sufficient supply. If there is a rapid increase in the load and the power supply drops, there will be an overload. Overload can result in power supply outages, because of the uneven distribution of loads or excess. This disruption caused continued power services to customers. This condition can be overcome by planned and regular load shedding. Load separation is done by simulation of Power Flow Analysis on ETAP 12.6 software. In the scenario that is run the author makes IBT 1 as the main source, and IBT 2 as the center of interference and is independent of the system. IBT 1 provides 30% of its backup supply to the loading of IBT 2. The load that has been removed from IBT 1, namely load 1, load 2, load 3, load 4, lump 8, lump 9 and lump 14 which is 127,4 MVA or about 30% of IBT 1 and IBT 2 load total.
Inventory Code | Barcode | Call Number | Location | Status |
---|---|---|---|---|
2007001260 | T37503 | T375032020 | Central Library (REFERENSI) | Available but not for loan - Not for Loan |
No other version available