The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of KAJIAN PENINGKATAN KINERJA RUAS JALAN DI KECAMATAN GANDUS AKSES MENUJU JALAN SOEKARNO HATTA SETELAH JEMBATAN MUSI V BEROPERASI

Skripsi

KAJIAN PENINGKATAN KINERJA RUAS JALAN DI KECAMATAN GANDUS AKSES MENUJU JALAN SOEKARNO HATTA SETELAH JEMBATAN MUSI V BEROPERASI

Wardani, Cyntia - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

The construction of the Musi V bridge is included in the series of the Kapal Betung toll road, with a toll exit ramp located in Pulokerto Village Gandus district. It is estimated that when the Musi V bridge operates there will be an increase in traffic flow on roads in the Gandus district, because the district is a very strategic area covering the area agropolitan, industrial, tourist destination and others. In addition, there are several roads alternatives to and from the nasional roads in the district. One national road can be accesed via several roads in Gandus district from the toll exit ramp is Soekarno Hatta street. In anticipation of a decrease in the level of roads services at some roads as access to Jalan Soekarno Hatta, require performance calculations road sections for existing conditions and after Musi V bridge operates. Data processing traffic volume is carried out using the 2014 PKJI method and the Vissim program. Based on PKJI 2014 calculations, the level of roads service has decreased after the Musi V operates, and result of Vissim simulation showed an increase of queue length and delay. After analyzing, the roads segment perfomance improves by making geometric changes namely road widening. The results of 2014 PKJI analysis, road widening was able to reduce degree of saturation from 1,24 to 0,61, level of service from F to C. The result of Vissim simulation showed a decrease in queue length from 79 meters to 57 meter and vehicles delay from 26 seconds to 14 seconds.


Availability
Inventory Code Barcode Call Number Location Status
2007001432T38545T385452020Central Library (REFERENCES)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T385452020
Publisher
Inderalaya : Prodi Teknik Sipil Perencanaan, Fakultas Teknik Universitas Sriwijaya., 2020
Collation
xvi, 58 hlm. : ilus.; 28 cm
Language
Indonesia
ISBN/ISSN
-
Classification
625.707
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
teknik jalan raya
Jurusan teknik sipil dan Perencanaan
Specific Detail Info
-
Statement of Responsibility
DS
Other version/related

No other version available

File Attachment
  • KAJIAN PENINGKATAN KINERJA RUAS JALAN DI KECAMATAN GANDUS AKSES MENUJU JALAN SOEKARNO HATTA SETELAH JEMBATAN MUSI V BEROPERASI
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search