The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of KAJIAN TERHADAP KINERJA PENGEBORAN DAN PELEDAKAN BATU KAPUR DI TAMBANG BATURAJA I PT SEMEN BATURAJA (PERSERO), Tbk. SUMATERA SELATAN

Skripsi

KAJIAN TERHADAP KINERJA PENGEBORAN DAN PELEDAKAN BATU KAPUR DI TAMBANG BATURAJA I PT SEMEN BATURAJA (PERSERO), Tbk. SUMATERA SELATAN

Pralingga, Rizky Lyan - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT. Semen Baturaja (Persero), Tbk is a state-owned company engaged in the cement industry. One of the main materials in the cement manufacturing industry is limestone. Limestone is fed by drilling and blasting methods. One of the benchmarks for blasting operations is blasting fragmentation where the limestone fragmentation> 100 cm (boulders) produced is not more than 15%, so that the excavator's productivity can be optimal because the resulting excavator cycle time will be small. The purpose of this study is to assess the performance of drilling, blasting performance and excavator performance. The average drilling geometry is 3.1 meter burden, 4.8 meter spacing, 5 meter hole depth, 2.1 meter powder charge, 2.95 meter stemming, and 0.25 kg / bcm powder factor. From the design of the drilling geometry, the Furukawa Rock Drill PCR 200 drill cycle time is 498.54 seconds or 8.31 minutes per hole and the resulting productivity is 308.46 m3 / hour. The distribution of rock fragmentation resulted from blasting was known using Split Desktop software, where the average boulders was 12.79%. From the blasting fragmentation results, it was found that the CAT 320 excavator cycle time was 21.68 seconds on average. The factors affecting the performance of the CAT 320 excavator are due to work efficiency and fragmentation distribution. The actual work efficiency was obtained at 69.75%, while the work efficiency after the repair was 74.25%, so there was an increase in work efficiency which was 4.5%. The actual productivity of the CAT 320 excavator prior to improvement in work efficiency was 174.39 tonnes / hour and productivity after repairs was 185.63 tonnes / hour.


Availability
Inventory Code Barcode Call Number Location Status
2007001368T39173T391732020Central Library (REFERENCES)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T391732020
Publisher
Inderalaya : Prodi Teknik Pertambangan, Fakultas Teknik Universitas Sriwijaya., 2020
Collation
xiv, 53 hlm.; tab.; ilus.; 28 cm.
Language
Indonesia
ISBN/ISSN
-
Classification
622.307
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Teknik Pertambangan.
Pengeboran dan Peledakan Batu Kapur
Specific Detail Info
-
Statement of Responsibility
MI
Other version/related

No other version available

File Attachment
  • KAJIAN TERHADAP KINERJA PENGEBORAN DAN PELEDAKAN BATU KAPUR DI TAMBANG BATURAJA I PT SEMEN BATURAJA (PERSERO), Tbk. SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search