The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of KAJIAN TEKNIS PEMINDAHANALUR SUNGAI DALAM RANGKA KONSERVASI CADANGAN BATUBARA DAN OPTIMASI PIT PADA AREA PENAMBANGAN PT. BUMI MERAPI ENERGI KABUPATEN LAHAT SUMATERA SELATAN

Skripsi

KAJIAN TEKNIS PEMINDAHANALUR SUNGAI DALAM RANGKA KONSERVASI CADANGAN BATUBARA DAN OPTIMASI PIT PADA AREA PENAMBANGAN PT. BUMI MERAPI ENERGI KABUPATEN LAHAT SUMATERA SELATAN

SUPARTO, MEJI - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT. Bumi Merapi Energi is a company engaged in the coal mining industry. PT. BME has a problem, namely the existence of coal reserves which are located below the river segment. The existence of natural resources such as coal stored under the Serelo River at the mining site of PT. Bumi Merapi Energi. then PT. Bumi Merapi Energi conserves coal reserves, by moving the Selero River section that crosses the coal reserves, the river is moved according to the rules and regulations in force in the Republic of Indonesia. The purpose of this research is to discuss about river displacement and conservation of coal reserves. This research was conducted by direct survey on the Serelo river, measuring the flow rate, measuring the cross-sectional area of the river, taking the timing of the digging and transporting tools. This data processing using Microsoft Excel software. PT.BME has an actual production of 265,782,514 Bcm / month mechanical equipment for the Doosan DX800 backhoe excavator digging tool, while for the Terex TR50 dump truck it is 263,570.31 Bcm / month. The old Serelo River has a water discharge of 6.75 m3 / second or 6,750 liters / second while the new Serelo River has a discharge of 6.90 m3 / second or 6,900 liters / second. Based on the calculation of the actual production of mechanical equipment and the flow rate of the Serelo River, the estimated completion time of the Serelo River removal work is 8.5 months or 225 days using 2 units of digging and 8 conveyances. Keywords :Conservation, Serelo River, Production


Availability
Inventory Code Barcode Call Number Location Status
2007001291T37566T375662020Central Library (REFERENSI)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T375662020
Publisher
Inderalaya : Fakultas Teknik Universitas Sriwijaya., 2020
Collation
xvi, 96 hlm.; ilus., tab.: 28 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.07
Content Type
-
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
teknik pertambangan
Pemindahan alur sungai
Specific Detail Info
-
Statement of Responsibility
EM
Other version/related

No other version available

File Attachment
  • KAJIAN TEKNIS PEMINDAHANALUR SUNGAI DALAM RANGKA KONSERVASI CADANGAN BATUBARA DAN OPTIMASI PIT PADA AREA PENAMBANGAN PT. BUMI MERAPI ENERGI KABUPATEN LAHAT SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search