The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of PERENCANAAN ULANG DIMENSI SUMP DAN POMPA UNTUK MENGATASI OVERLOAD PADA SUMP A DI PT. BUANA ELTRA, OGAN KOMERING ULU, SUMATERA SEALATAN

Skripsi

PERENCANAAN ULANG DIMENSI SUMP DAN POMPA UNTUK MENGATASI OVERLOAD PADA SUMP A DI PT. BUANA ELTRA, OGAN KOMERING ULU, SUMATERA SEALATAN

Armelia, Yustika - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT. Buana Eltra is a coal mining company that uses the open pit mining method. One factor that can disrupt mining activities is the water factor, so an ideal drainage system is needed to prevent water from entering the mining area. Drainage system used at PT. Buana Eltra is mine dewatering, where sump A in the middle of the pit. If the intensity of rain is high, water will stagnate in the work area resulting in sump A often overload. For the reason, it is necessary to re-design dimensions of sump and pump to overcome at sump A. The purpose of this study is to determine the total incoming water discharge, planning the optimal sump dimension, and planning the number and hours of sump work on sump A at PT. Buana Eltra. The research was conducted by calculating and analyzing rainfall data, catchment area, and total incoming water debit so that the obtained optimal sump dimension. From the results of the research, total discharge entering into the mining area of 2,228.65 m3/day with rainfall of 56.28 mm/day and the catchment area of 183,583.76 m2. Sump is designed to be trapezoidal with dimension of length and width of sump surface is 28 m, length and width of sump base is 18 m, and with depth 5 m. The required sump volume is 2,770 m3. Pump that is used remains with the old pump that is one unit of the deeflo pump model DP2500-2 with the pump working hours increased to 21 hours/day.


Availability
Inventory Code Barcode Call Number Location Status
2007001296T30722T307222020Central Library (REFERENCES)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T307222020
Publisher
Inderalaya : Prodi Teknik Pertambangan, Fakultas Teknik Universitas Sriwijaya., 2020
Collation
xiv, 32 hlm.; tab.; ilus.; 28 cm.
Language
Indonesia
ISBN/ISSN
-
Classification
551.577 07
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Sump
Teknik Pertambangan.
Pompa Overload
Specific Detail Info
-
Statement of Responsibility
MI
Other version/related

No other version available

File Attachment
  • PERENCANAAN ULANG DIMENSI SUMP DAN POMPA UNTUK MENGATASI OVERLOAD PADA SUMP A DI PT. BUANA ELTRA, OGAN KOMERING ULU, SUMATERA SEALATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search