The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of EVALUASI KINERJA CRUSHING PLANT UNTUK MEREDUKSI UKURAN BATU KAPUR AGAR TERCAPAI TARGET PRODUKSI DI PT. SEMEN BATURAJA TBK, KABUPATEN OKU, SUMATERA SELATAN

Skripsi

EVALUASI KINERJA CRUSHING PLANT UNTUK MEREDUKSI UKURAN BATU KAPUR AGAR TERCAPAI TARGET PRODUKSI DI PT. SEMEN BATURAJA TBK, KABUPATEN OKU, SUMATERA SELATAN

Haryanti, Meriska  - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT Semen Baturaja Tbk is engaged in mining limestone, which is the main raw material for cement production. The limestone that has been mined is then reduced in size by a crusher and then transferred to storage by a belt conveyor before processing the product in the form of cement. Limestone Crusher Factory II is a hammer crusher type. In November 2023, Limestone Crusher Factory II targets production of 271,730 tons/month with planned working hours of 427.86 hours/month, but actual production is only 230,561.62 tons/month with effective working hours of 353.46 hours. This research aims to improve the performance of Limestone Crusher Factory II, identify the causes of not achieving production targets due to time constraints and overcome problems that occur. Standby time constraints result in waste of electrical energy. Statistical methods were used to improve the resistance time and split desktop 2.0 software was used to process rock fragmentation data. Then the processing results are used to determine the work efficiency of the Factory II Limestone Crusher by entering the F80 and P80 size values into the work index bond formula so that the work efficiency of the Factory II Limestone Crusher increases from 82.61% to 90.88% and total production increases to 253,653.4 tons.


Availability
Inventory Code Barcode Call Number Location Status
2407003855T148073T1480732024Central Library (Reference)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1480732024
Publisher
Indralaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2024
Collation
xvii, 126 hlm.; ilus.; tab.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
666.940 7
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Crushing Plant
Specific Detail Info
-
Statement of Responsibility
KA
Other version/related
TitleEditionLanguage
EVALUASI KINERJA COAL CRUSHING PLANT UNTUK MENCAPAI TARGET PRODUKSI BATUBARA DI PT. SERVO MINING CONTRACTOR SITE PENERUS BARU KABUPATEN TAPIN KALIMANTAN SELATANid
EVALUASI KINERJA CRUSHING PLANT DALAM UPAYA PENCAPAIAN TARGET PRODUKSI CRUSHED COAL DI PT. JASA LAKSA UTAMA, KABUPATEN LAHAT, SUMATERA SELATAN.id
File Attachment
  • EVALUASI KINERJA CRUSHING PLANT UNTUK MEREDUKSI UKURAN BATU KAPUR AGAR TERCAPAI TARGET PRODUKSI DI PT. SEMEN BATURAJA TBK, KABUPATEN OKU, SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search