The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
No image available for this title

Skripsi

KAJIAN PENGARUH GEOMETRI TERHADAP FRAGMENTASI DAN BIAYA PELEDAKAN BATU KAPUR DI PT SEMEN PADANG

Pratama, Andre Husani - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

Blasting activities at PT Semen Padang are carried out to fragment hard rock formations using a blast geometry that typically involves a burden of 3–4 meters, spacing of 3–5 meters, and blast hole depths of up to 11 meters. The explosive used is DABEX 73, a mixture of 70% ANFO and 30% emulsion, produced on-site and mixed using a Mobile Manufacturing Truck (MMT), ensuring both operational efficiency and work safety. In practice, the applied blast geometry includes a burden of 4.2 meters, spacing of 4.7 meters, a stemming length of 3.7 meters, and a blast hole depth of 10.6 meters. The explosive column length is 6.9 meters with 117.3 kilograms of explosives used per hole. However, based on analysis using the R.L. Ash method, a more optimal blast geometry is recommended: 4 meters for both burden and stemming, 6 meters for spacing, 12 meters for blast hole depth, and a column length of 9 meters, requiring 136,8 kilograms of explosives per hole. The actual blasting cost amounted to IDR 4.546.639.414,00, while the theoretical cost using the R.L. Ash method was lower, at IDR 4.425.858.240,00. From 23 blasting events using the current geometry, a total of 771,453.12 tons of rock was fragmented across 1,419 blast holes, which still falls short of the company’s production target of 827,277 tons. In contrast, with the optimized geometry, only 1183 blast holes would be required to achieve a rock yield of approximately 827.626 tons.


Availability
Inventory Code Barcode Call Number Location Status
2507006297T185834T1858342025Central Library (Reference)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1858342025
Publisher
Indralaya : Prodi Teknik Pertambangan, Jurusan Pertambangan dan Geologi Fakultas Teknik Universitas Sriwijaya., 2025
Collation
xiv, 142 hlm.; ilus.; tab.; 29 cm.
Language
Indonesia
ISBN/ISSN
-
Classification
552.507
Content Type
Text
Media Type
unmediated
Carrier Type
other (computer)
Edition
-
Subject(s)
Prodi Pertambangan dan Geologi
Batuan Kapur
Specific Detail Info
-
Statement of Responsibility
MI
Other version/related
TitleEditionLanguage
PERENCANAAN GEOMETRI PEMBORAN DAN PELEDAKAN UNTUK DAPAT MENGURANGI BATUAN KAPUR BERUKURAN LEBIH DARI 1 METER DI QUARRY BATU KAPUR AREA PENAMBANGAN PIT LIMIT 15,15 HA BUKIT KARANG PUTIH PT. SEMEN PADANG, SUMATERA BARATid
File Attachment
  • KAJIAN PENGARUH GEOMETRI TERHADAP FRAGMENTASI DAN BIAYA PELEDAKAN BATU KAPUR DI PT SEMEN PADANG
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search