The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS PENGARUH GEOMETRI PELEDAKAN DAN DELAY TIME TERHADAP FRAGMENTASI DI LOKASI PNBP TAMBANG LIMESTONE QUARRY PT SEMEN PADANG (PERSERO), SUMATERA BARAT

Skripsi

ANALISIS PENGARUH GEOMETRI PELEDAKAN DAN DELAY TIME TERHADAP FRAGMENTASI DI LOKASI PNBP TAMBANG LIMESTONE QUARRY PT SEMEN PADANG (PERSERO), SUMATERA BARAT

Asrafi, Asrafi - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT Semen Padang (Persero), one of Indonesia's oldest cement producers, employs drilling and blasting for rock breakage. The company's fragmentation standard is 80% for fragments measuring up to 80 cm and 20% for those over 80 cm. Direct observation indicates a high presence of boulders and secondary blasting activities, with many blasts utilizing a single free face. An average of 71 blast holes were drilled daily from January to February. Based on data from 12 blasts, the estimated fragmentation larger than 80 cm was 2.86% using the Kuz-Ram equation, while actual fragmentation analyzed with Split Desktop 4.0 showed 5.60% of fragments exceeding 80 cm. Blasting with surface delays of 17 ms and 25 ms proved more efficient and effective than 25 ms and 67 ms delays, as it shortened the blasting time and resulted in 4.34% of fragments larger than 80 cm, compared to 14.83% with 25 ms and 67 ms delays, according to Split Desktop 4.0 analysis.


Availability
Inventory Code Barcode Call Number Location Status
2507004696T180740T1807402025Central Library (REFERENS)Available but not for loan - Not for Loan
Detail Information
Series Title
03021282126060
Call Number
T1807402025
Publisher
Indralaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2025
Collation
xvii, 117 hlm.; ilus.; tab.; 29 cm.
Language
Indonesia
ISBN/ISSN
-
Classification
622.07
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Teknik Tambang
Specific Detail Info
-
Statement of Responsibility
MURZ
Other version/related

No other version available

File Attachment
  • ANALISIS PENGARUH GEOMETRI PELEDAKAN DAN DELAY TIME TERHADAP FRAGMENTASI DI LOKASI PNBP TAMBANG LIMESTONE QUARRY PT SEMEN PADANG (PERSERO), SUMATERA BARAT
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search