The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of EVALUASI WAKTU DAN BIAYA DENGAN METODE EARNED VALUE MANAGEMENT (EVM) PADA PROYEK PEMBANGUNAN LATTICE TOWER

Skripsi

EVALUASI WAKTU DAN BIAYA DENGAN METODE EARNED VALUE MANAGEMENT (EVM) PADA PROYEK PEMBANGUNAN LATTICE TOWER

Aulia, Tasya Permata - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

This research aims to evaluate project performance in terms of cost and time using the Earned Value Management (EVM) method on a high-complexity construction project: the Phase III development of the Lattice Tower Lightning System, involving the construction of 111 towers at PT Kilang Pertamina Internasional RU III Plaju. EVM is applied to assess project execution efficiency through two key indicators: the Cost Performance Index (CPI) and the Schedule Performance Index (SPI). The data used include primary data from field observations and documentation, and secondary data such as S-curves, bar charts, and progress graphs. The analysis shows an average CPI of 1.1111, indicating that the project was cost-efficient and did not exceed the budget. However, the average SPI of 0.6688 reveals a significant schedule delay, particularly from weeks 2 to 15. Time performance improved in the final stage, with the SPI exceeding 1 in week 16. Delays were primarily caused by design revisions, construction errors, unfavorable site conditions, and extreme weather that disrupted activities. This evaluation is expected to serve as a reference for future projects of similar scale, contributing to improved cost and time efficiency.


Availability
Inventory Code Barcode Call Number Location Status
2507004276T179274T1792742025Central Library (Reference)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1792742025
Publisher
Indralaya : Prodi Teknik Sipil dan Perencanaan, Fakultas Teknik Universitas Sriwijaya., 2025
Collation
xvii, 117 hlm.; ilus.; tab.; 29 cm.
Language
Indonesia
ISBN/ISSN
-
Classification
624.07
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Teknik Sipil
Specific Detail Info
-
Statement of Responsibility
MI
Other version/related

No other version available

File Attachment
  • EVALUASI WAKTU DAN BIAYA DENGAN METODE EARNED VALUE MANAGEMENT (EVM) PADA PROYEK PEMBANGUNAN LATTICE TOWER
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search