The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of EVALUASI PERENCANAAN BIAYA REKLAMASI BERDASARKAN KAJIAN TEKNIS PADA TAMBANG BATUBARA DI PT. FIRMAN KETAUN,BENGKULU UTARA

Skripsi

EVALUASI PERENCANAAN BIAYA REKLAMASI BERDASARKAN KAJIAN TEKNIS PADA TAMBANG BATUBARA DI PT. FIRMAN KETAUN,BENGKULU UTARA

Ramadhan, Muhammad Dzaky Putra - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

Reclamation is an effort to restore land affected by mining activities to restore ecological and environmental functions according to their designation. This process involves landscaping, revegetation and management of mine water quality. In mining, reclamation is a company obligation that must be carried out in accordance with regulations, such as the Minister of Energy and Mineral Resources Decree No. 1827/K/30/MEM/2018. Evaluating reclamation cost planning is essential to ensure the effectiveness and efficiency of implementation, while identifying operational constraints and the need for budget adjustments. This study evaluates the reclamation cost planning of a coal mine in PT Firman Ketaun, North Bengkulu, for the period 2021-2025. The focus is on the reclamation of 71 hectares of land, which includes the arrangement of 142,000 m³ of material for 842.77 hours, the spreading of 213,000 m³ of topsoil for 3,044.17 hours, the construction of 17 drainage channels in 52.71 hours, and a sediment pond with a capacity of 5,358.31 m³ requiring 122.83 hours. Revegetation was planned by planting 62,126 pioneer and insertion trees, and adding 0.05 kg/m³ of lime to neutralize acid mine drainage. Evaluation results showed the total reclamation cost was Rp 8.665.245.690, consisting of direct costs of Rp 6.741.125.358 and indirect costs of Rp 1.924.120.331,21. Factors such as lack of topsoil, fast-draining soil, weather changes, and livestock disturbance affect the effectiveness of reclamation. Even so, PT Firman Ketaun's reclamation cost planning is in accordance with MEMR Decree No. 1827/K/30/MEM/2018.


Availability
Inventory Code Barcode Call Number Location Status
2407006960T162541T1625412024Central Library (REFERENS)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1625412024
Publisher
Indralaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2024
Collation
xii, 133 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.107
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Eksploitasi, Eksplorasi
Specific Detail Info
-
Statement of Responsibility
MURZ
Other version/related

No other version available

File Attachment
  • EVALUASI PERENCANAAN BIAYA REKLAMASI BERDASARKAN KAJIAN TEKNIS PADA TAMBANG BATUBARA DI PT. FIRMAN KETAUN,BENGKULU UTARA
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search