The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS SISTEM MINE DEWATERING TAMBANG BATUBARA DI PIT SECTION 2 PT BUDI GEMA GEMPITA, KABUPATEN LAHAT, SUMATERA SELATAN

Skripsi

ANALISIS SISTEM MINE DEWATERING TAMBANG BATUBARA DI PIT SECTION 2 PT BUDI GEMA GEMPITA, KABUPATEN LAHAT, SUMATERA SELATAN

Tamnge, Vania Kareena - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

One of the coal mining companies named PT Budi Gema Gempita (BGG) has a production-operation mining business permit covering an area of 1,524 hectares located in Muara Lawai Village, East Merapi District, Lahat Regency, South Sumatra Province. Mining is carried out in pit section 2 with an area of 67.49 Ha. Mine base pit section 2 PT Budi Gema Gempita is located at an elevation of – 38 m with its highest point located at an elevation of 54 m, so it has a depth of 90 m. Coal mining activities at PT Budi Gema Gempita uses the open-pit mining method. Weather is an important factor that greatly affects coal mines with the open-pit mining method. High rainfall can disrupt the sustainability of mining operations. During the observation process, coal mining activities in pit section 2 were often flooded. This is due to the analysis of the mine dewatering system that has not been good. Therefore, it is necessary to re-plan the capacity and dimensions of the sump and find out the number of pump needs in pit section 2 so that when it rains, the water entering the pit does not overflow which can cause mining activities to be disrupted. From the results of the study, it was found that the total water entering the mining area amounted to 13.292,59 m3/day. It requires an additional sump volume of 81,891.63 m3 from the actual sump volume of 132,284.27 m3, so that the sump volume after addition is 214.175,904 m3. The pumping discharge of the Multiflo 420 pump is 884,76 m3/hour with working hours of 16 hours per day so that the amount of water pumped in one day is 14.156,16 m3/day. The number of pumps needed in pit section 2 is 1 unit while still using the same pump Multiflo 420 pump.


Availability
Inventory Code Barcode Call Number Location Status
2407002647T143754T1437542024Central Library (References)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1437542024
Publisher
Indralaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2024
Collation
xv, 70 hlm.; ilus.; tab; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.07
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik tambang
Specific Detail Info
-
Statement of Responsibility
KA
Other version/related

No other version available

File Attachment
  • ANALISIS SISTEM MINE DEWATERING TAMBANG BATUBARA DI PIT SECTION 2 PT BUDI GEMA GEMPITA, KABUPATEN LAHAT, SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search