The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of PERENCANAAN TEKNIS SEQUENCE PENAMBANGAN DAN NILAI EKONOMI DALAM UPAYA KONSERVASI SUMBERDAYA BATUBARA DI PIT SOUTH SP TIMUR DAN PIT SOUTH ABL PT BANJARSARI PRIBUMI, KABUPATEN LAHAT, SUMATERA SELATAN

Skripsi

PERENCANAAN TEKNIS SEQUENCE PENAMBANGAN DAN NILAI EKONOMI DALAM UPAYA KONSERVASI SUMBERDAYA BATUBARA DI PIT SOUTH SP TIMUR DAN PIT SOUTH ABL PT BANJARSARI PRIBUMI, KABUPATEN LAHAT, SUMATERA SELATAN

Purba, Intan D. Angelita  - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

In accordance with the calculation of economic value from the engineering department at PT Banjarsari Pribumi, it was obtained that the South SP Timur pit is an uneconomical pit to mine because it generates negative net income. However, in the effort of additional reserve opportunities and expansion of IPD South disposal capacity, in 2024 PT Banjarsari Pribumi plans to integrate with the South ABL pit. where in 2023 the South ABL pit has carried out overall overburden stripping and partial coal getting. To actualize these optimization activities, it requires a technical planning sequence and economic value of both pits and their integration. Technical sequence planning consists of pit design and disposal planning using Minescape 5.7 software and fleet number planning. For economic value is obtained from the value of fixed costs, production costs and sales results. Based on calculations with sample-polygon tools, the overburden volume is 3,226,809.29 bcm and an estimated coal tonnage is 667.805,29 tons with a stripping ratio (SR) value of 4,83. From the calculation of the economic value resulting from the integration results, a fixed cost value of IDR 84,015,220,792 was obtained; production costs of IDR 80,716,585,440.57; coal sales proceeds amounted to IDR 270,679,915,879.72; and sales profit of IDR 70,518,109,647.29.


Availability
Inventory Code Barcode Call Number Location Status
2407002529T143395T1433952024Central Library (References)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1433952024
Publisher
Indralaya : Prodi Magister Teknik Pertambangan, Fakultas Teknik Universitas Sriwijaya., 2024
Collation
ix, 33 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.07
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Prodi Magister Teknik Pertambangan
Teknis Sequence
Specific Detail Info
-
Statement of Responsibility
KA
Other version/related

No other version available

File Attachment
  • PERENCANAAN TEKNIS SEQUENCE PENAMBANGAN DAN NILAI EKONOMI DALAM UPAYA KONSERVASI SUMBERDAYA BATUBARA DI PIT SOUTH SP TIMUR DAN PIT SOUTH ABL PT BANJARSARI PRIBUMI, KABUPATEN LAHAT, SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search