The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of EVALUASI GEOMETRI JALAN ANGKUT TAMBANG SEBAGAI UPAYA PENCAPAIAN TARGET PENGUPASAN OVERBURDEN 330.000 BCM/BULAN DI PT ERA ENERGI MANDIRI, LAHAT, SUMATERA SELATAN

Skripsi

EVALUASI GEOMETRI JALAN ANGKUT TAMBANG SEBAGAI UPAYA PENCAPAIAN TARGET PENGUPASAN OVERBURDEN 330.000 BCM/BULAN DI PT ERA ENERGI MANDIRI, LAHAT, SUMATERA SELATAN

Praba, Aditya Sri Rajasa Lingga  - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

The ideal mining transportation route will optimize production results according to planned production goals. PT Era Energi Mandiri's overburden stripping target in February was 240,000 bcm and actual stripping was 150,000 bcm. Meanwhile, last month, namely January, the target for overburden removal was 330,000 bcm, the actual transfer was 145,000 bcm. One of the causes of non-compliance is less than ideal haul road geometry, such as less than ideal road width, slopes that are too steep, etc., causing the truck's travel time from the F1 pit to the dump to be very long. The purpose of this research is to evaluate the geometric conditions of overloaded haul roads made based on AASHTO regulations, analyze the geometric dimensions of the transport track required by trucks compared to dump trucks, and compare the productivity of dump trucks before and after improving the transport geometry. Highway. Based on the research results, a plan for structuring the mining transportation route from pit F1 to the storage area has been prepared, consisting of 23 sections. The actual dragline shape has a straight line width of 5.08 to 11.87 meters, an angled line width of 5.91 to 12.85 meters, a super height of 0.00 to 0.1 meters with a curved radius of 13.15 meters. points from 0.08 to 17.31%. Based on road geometry calculations using AASHTO regulations, many roads still do not meet standards. Dump truck cycle time before repair was 15.81 minutes, after repair 5.06 minutes with load and 2.66 minutes without load, total time 2.4 minutes.


Availability
Inventory Code Barcode Call Number Location Status
2407002496T143170T1431702024Central Library (References)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1431702024
Publisher
Indralaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2024
Collation
xvi, 99 hlm.; tab.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.07
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Specific Detail Info
-
Statement of Responsibility
KA
Other version/related

No other version available

File Attachment
  • EVALUASI GEOMETRI JALAN ANGKUT TAMBANG SEBAGAI UPAYA PENCAPAIAN TARGET PENGUPASAN OVERBURDEN 330.000 BCM/BULAN DI PT ERA ENERGI MANDIRI, LAHAT, SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search