Image of PERENCANAAN PENJADWALAN ULANG PROYEK DENGAN VARIASI JUMLAH TENAGA KERJA DAN PREDECESSOR MENGGUNAKAN METODE CPM (STUDI KASUS: PROYEK ISLAMIC CENTER KOTA JAMBI)

Skripsi

PERENCANAAN PENJADWALAN ULANG PROYEK DENGAN VARIASI JUMLAH TENAGA KERJA DAN PREDECESSOR MENGGUNAKAN METODE CPM (STUDI KASUS: PROYEK ISLAMIC CENTER KOTA JAMBI)

Setiawati, RA. Kiran Aulia - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

Effective scheduling is a key factor for the successful execution of construction projects, especially those with high complexity levels, such as the construction of the Islamic Center Building in Jambi City. This study aims to analyze the impact of variations in workforce size and variations in predecessor relationships with a modified Finish-to-Start (FS) type incorporating overlap levels of 25%, 50%, and 75% on the project completion duration. The Critical Path Method (CPM) was employed, analyzing data from both the substructure and superstructure phases. Four scheduling scenarios were developed based on different workforce sizes in accordance with the 2024 Ministry of Public Works and Housing (PUPR) regulations for Civil Works and relevant literature. Scheduling was performed using Microsoft Excel and Microsoft Project software. Each scenario was further varied by adjusting the FS predecessor relationships with different overlap levels. The results indicate that scenarios with an optimal workforce size yield shorter task durations. Furthermore, applying a high overlap of 75% in FS relationships resulted in a total project duration of 230.5 days with 24 critical tasks, which is faster compared to the total duration of 238 days derived from the S-curve method. This study recommends the adoption of BIM-based scheduling strategies to more accurately anticipate field condition changes and optimize resource allocation.


Availability
Inventory Code Barcode Call Number Location Status
2507003844T177405T1774052025Central Library (Reference)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1774052025
Publisher
Indralaya : Prodi Teknik Sipil dan Perencanaan, Fakultas Teknik Universitas Sriwijaya., 2025
Collation
xviii, 166 hlm.; ilus.; tab.; 29 cm.
Language
Indonesia
ISBN/ISSN
-
Classification
624.07
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Teknik Sipil
Specific Detail Info
-
Statement of Responsibility
MI
Other version/related

No other version available

File Attachment
  • PERENCANAAN PENJADWALAN ULANG PROYEK DENGAN VARIASI JUMLAH TENAGA KERJA DAN PREDECESSOR MENGGUNAKAN METODE CPM (STUDI KASUS: PROYEK ISLAMIC CENTER KOTA JAMBI)
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search