The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of PERTIMBANGAN HAKIM TERHADAP PENYELESAIAN PERKARA TINDAK PIDANA KORUPSI DALAM PERADILAN PIDANA MILITER (STUDI PUTUSAN MAHKAMAH AGUNG NOMOR: 363 K/MIL/2017)

Skripsi

PERTIMBANGAN HAKIM TERHADAP PENYELESAIAN PERKARA TINDAK PIDANA KORUPSI DALAM PERADILAN PIDANA MILITER (STUDI PUTUSAN MAHKAMAH AGUNG NOMOR: 363 K/MIL/2017)

Qurbani, Fauqa Shafa - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

In 2025, PT. Duta Bara Utama targets coal production of 2.250.000 tons of coal with SR that must less than 3,5. The actual production in January 2025 was 112.480,03 tons of coal and 230.486,10 BCM of overburden. . The out pit dump disposal areas, namely the northern and southern disposals in 2025, cannot accommodate the planned overburden volume, so dumping will be done in the in pit dump. Planning for loading and hauling equipment requirements is using Microsoft Excel 2021, mining scheduling is created with the help of Spry software, while pit and disposal designs are created with Minescape 5.7 software. In the first quarter, the production plan is 374.881,49 tons of coal and 1.219.000,96 BCM of overburden with an SR of 3,25. In Quarter II, the production plan is 544.345,39 tons of coal and 2.015.154,65 BCM of overburden with an SR of 3,70. In Quarter III, the production plan is 641.818,95 tons of coal and 2.375.999,62 BCM of overburden with an SR of 3,70. In Quarter IV, the production plan is 707.918,65 tons of coal and 1.978.860,85 BCM of overburden with an SR of 2,80. The total production plan for the year 2025 is 2.263.888,79 tons of coal and 7.589.016,09 BCM of overburden with an SR of 3,34, which achieve the specified production target. Then, mining scheduling will be performed using the trial and error method on the Spry software until a scenario is found that achieve the production targets and the exposed coal balance. The pit design and disposal plans for quarters I, II, III, and IV are designed based on the planned coal tonnage and volume of overburden.


Availability
Inventory Code Barcode Call Number Location Status
2407001316T140367T1403672024Central Library (References)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1403672024
Publisher
Indralaya :  Prodi Ilmu Hukum, Fakultas Hukum Universitas Sriwijaya., 2024
Collation
xiv, 76 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
340.07
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Prodi Ilmu Hukum
Specific Detail Info
-
Statement of Responsibility
KA
Other version/related

No other version available

File Attachment
  • PERTIMBANGAN HAKIM TERHADAP PENYELESAIAN PERKARA TINDAK PIDANA KORUPSI DALAM PERADILAN PIDANA MILITER (STUDI PUTUSAN MAHKAMAH AGUNG NOMOR: 363 K/MIL/2017)
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search