The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of MODIFIKASI DESAIN MIDDLE AIR DECK PADA PELEDAKAN OVERBURDEN DI PT. BUKIT MAKMUR MANDIRI UTAMA (PT. BUMA) SITE LATI KALIMANTAN TIMUR

Skripsi

MODIFIKASI DESAIN MIDDLE AIR DECK PADA PELEDAKAN OVERBURDEN DI PT. BUKIT MAKMUR MANDIRI UTAMA (PT. BUMA) SITE LATI KALIMANTAN TIMUR

Sinaga, Bastianus - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT. BUMA Site Lati is applying deep hole blasting in 2017, it is blasting at a depth of 12 m-18 m to enlarge the inventory of blasting material. In addition, deep hole blasting also increases the efficiency of time and cost in by increasing Use of Availability (UA) drilling machine, reducing travel unit, and minimizing drilling preparation. But deep hole blasting also causes an increase in powder factor value. Blasting deep hole at PT. BUMA Lati with the addition of air deck has an average powder factor value of 0.26 and some blasting produces boulder material. The standart powder factor value that designed is 0,.23-0,24. To reduce the value of the powder factor and to improve the quality of the blasting ffagments, the air deck ratio decreasing was designed. The ffagmentation of blasting material result by 10 trials, before modification of middle air deck, the powder factor is 0,26; ratio air deck 31%, the smallest size of P 80 is 0,37 m, the largest is 0,79 m and 5 blasting only produces fractures on the surface. Top size or largest size is in the range of 0,62 m to 1,60 m. The average digging time on the Hitachi EX 3600 power shovel unit before the modification of air deck design is 16,2 seconds where the digging time target set by PT. BUMA Site Lati is 12 seconds up to 14 seconds. The actual average productivity is 1,307,2 bcm / hour, where the productivity target set by PT. BUMA Site Lati is 1,450 bcm / hour. After the modification of middle air deck, powder factor is 0,24, ratio air deck is 20 %, the smallest size of P 80 is 0,38 m and the largest is 1,27 m. Top size is in the range of 0,63 m up to 2,26 m. After modification of middle air deck design, the average digging time is 13,1 seconds. The actual productivity is 1,479.6 bcm / hour. where the productivity target set by PT. BUMA Site Lati is 1,450 bcm / hour.


Availability
Inventory Code Barcode Call Number Location Status
1807001058T141353T1413532017Central Library (References)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1413532017
Publisher
Inderalaya : Prodi Teknik Pertambangan, Fakultas Teknik Universitas Sriwijaya., 2017
Collation
xiv, 38 hlm. : ilus. ; tab. ; 28 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.230 7
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Teknik peledakan
Prodi Teknik Pertambangan
Specific Detail Info
-
Statement of Responsibility
DS
Other version/related

No other version available

File Attachment
  • MODIFIKASI DESAIN MIDDLE AIR DECK PADA PELEDAKAN OVERBURDEN DI PT. BUKIT MAKMUR MANDIRI UTAMA (PT. BUMA) SITE LATI KALIMANTAN TIMUR
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search