The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISA FORMASI DENGAN PENGUJIAN PRESSURE BUILD UP METODE HORNER-MBH DI ZONA DST-1 PADA SUMUR X BLOK SOUTH WEST BUKIT BARISAN PT. RADIANT BUKIT BARISAN E&P

Skripsi

ANALISA FORMASI DENGAN PENGUJIAN PRESSURE BUILD UP METODE HORNER-MBH DI ZONA DST-1 PADA SUMUR X BLOK SOUTH WEST BUKIT BARISAN PT. RADIANT BUKIT BARISAN E&P

Racineli, Marcel Octavian - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

Well test is a method to determine well actual condition and formation damage. The test held by analizing the form of pressure change due to the changing of production level. Afiter the drilling and completion of the well finished, company still cannot make further planning because of the lack of knowledge about what happen inside the well. Well testing data have to analized using well testing theory to obtain actual damage parameter. The analiysis purpose is to determine absolut openflow potential (AOF) and formation damage (skin factor). The analysis also can tell if there was an abnormaly treatment in well test procedure. PT Radian Bukit Barisan did the test to make a plan about the next simulation will be held and production capacity in the future. The analysis is using Homer Method with P2. Pressure build up analysis is using the MBH method, and the Modified Isochronal Test (MIT) using the deliverability and empiric method. The result is Well X has formation damage in level 37.75 (positive skin factor) that decreasing 1905 psi from the formation pressure. The damage caused formation permeability become 0.375 md. MIT test resulted the absolute openflow potential is 0.935 mmscfd.


Availability
Inventory Code Barcode Call Number Location Status
1707000660T140973T1409732017Central Library (References)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1409732017
Publisher
Inderalaya : Prodi Teknik Pertambangan, Fakultas Teknik Universitas Sriwijaya., 2017
Collation
xiv, 56 hlm. : ilus. ; tab. ; 28 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.292 07
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Teknik Ekskavasi
Prodi Teknik Pertambangan
Specific Detail Info
-
Statement of Responsibility
DS
Other version/related

No other version available

File Attachment
  • ANALISA FORMASI DENGAN PENGUJIAN PRESSURE BUILD UP METODE HORNER-MBH DI ZONA DST-1 PADA SUMUR X BLOK SOUTH WEST BUKIT BARISAN PT. RADIANT BUKIT BARISAN E&P
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search