The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA(K3) PADA PROYEK KONSTRUKSI

Text

ANALISIS PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA(K3) PADA PROYEK KONSTRUKSI

Merdekawati, Dilla - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

The implementation of an Occupational Safety and Health Management System (SMK3) is very important in construction projects to minimize the risk of work accidents and create a safe and productive work environment. This study aims to analyze the level of implementation of SMK3 and identify strategies to improve occupational safety in the construction project of the Lung Building of Siti Fatimah Hospital. The research was conducted with a descriptive quantitative approach using a data collection method in the form of distributing questionnaires to 15 respondents consisting of contractors and consultant management and supported by direct observation and literature studies. Data analysis was carried out using the help of Microsoft Excel and SPSS to test the validity and realism and calculate the score of the implementation of SMK3 and its improvement strategy. The results of the study showed that the implementation rate of SMK3 reached 85.63%, which was included in the satisfactory category and entitled to the title of golden flag according to Government Regulation No.50 of 2012. Although most of the elements have been well implemented, the monitoring and evaluation aspects still show lower values than the others. Suggested improvement strategies include regular training, strengthening supervision, and improving documentation and socialization of work procedures. It is hoped that the results of this research can be a reference for similar projects in strengthening the implementation of SMK3 as a whole.


Availability
Inventory Code Barcode Call Number Location Status
2507003327T174971T1749712025Central Library (Reference)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1749712025
Publisher
: Prodi Teknik Sipil, Fakultas Teknik Universitas Sriwijaya., 2025
Collation
xi, 81 hlm.; ill.; tab.; 29 cm.
Language
Indonesia
ISBN/ISSN
-
Classification
624.07
Content Type
-
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Teknik Sipil
Specific Detail Info
-
Statement of Responsibility
EM
Other version/related

No other version available

File Attachment
  • ANALISIS PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA(K3) PADA PROYEK KONSTRUKSI
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search