Image of EVALUASI KAPASITAS POMPA PADA SISTEM PENIRISAN TAMBANG BANKO BARAT PIT 1 TIMUR PT BUKIT ASAM (PERSERO) TBK UNIT PENAMBANGAN TANJUNG ENIM SUMATERA SELATAN

Skripsi

EVALUASI KAPASITAS POMPA PADA SISTEM PENIRISAN TAMBANG BANKO BARAT PIT 1 TIMUR PT BUKIT ASAM (PERSERO) TBK UNIT PENAMBANGAN TANJUNG ENIM SUMATERA SELATAN

Gultom, Yohannes - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

On the West Banko mine, mining activities carried out using conventional systems with a combination of excavator loading (backhoe) and transportation means (truck) so as the mine advances will form a large basin. In the rainy season the water will inundate the mining front that will lead to the cessation of coal mining operations. To cope with the incoming water would require pumps the number and capacity to pump water. Rain catchment area in pit 1 East West Banko December amounted to 124.19 hectare. Based on the calculation of total discharge of water into the sump pit 1 East of 77.081,48 m3/day, while the capacity of two units of 385 kW Sulzer pumps are used in sump pit East 1 that is equal to 9.1 and 10 m3/min with a total discharge pumping by 24.066 m3/day has not been able to control the water coming into the mine. Incompatibility between the discharge water that goes with the flow of water being pumped which is a basic need for the addition of two pump units and optimize the operation of the pump that has been operating. Capacity plans for two pump units that have been in operation in the amount of 14 m3/min. To anticipate the occurrence of stagnant water that can interfere with the activity of coal production, it is recommended to make improvements sump dimensions. Planned sump truncated pyramid-shaped with a surface area of 120 x 120 meters, basic area 110 x 110 meters, and a depth of 6 meters in order to obtain sump capacity of 79.400 m3.


Availability
Inventory Code Barcode Call Number Location Status
1607000338T15313T153132015Central Library (References)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T153132015
Publisher
Inderalaya : Prodi Teknik Pertambangan, Fakultas Teknik Universitas Sriwijaya., 2015
Collation
xii, 71 hlm. : ilus. ; tab. ; 28 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.507
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Pompa
drainase pertambangan
Penirisan Tambang
Prodi Teknik Pertambangan
Specific Detail Info
-
Statement of Responsibility
DS
Other version/related

No other version available

File Attachment
  • EVALUASI KAPASITAS POMPA PADA SISTEM PENIRISAN TAMBANG BANKO BARAT PIT 1 TIMUR PT BUKIT ASAM (PERSERO) TBK UNIT PENAMBANGAN TANJUNG ENIM SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search