The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of KAJIAN BIAYA PENAMBANGAN PER TON BATUBARA DAN PER BCM TANAH PENUTUP PADA TAMBANG BANKO BARAT PIT 3 BARAT PT. BUKIT ASAM (PERSERO), Tbk TANJUNG ENIM, SUMATERA SELATAN

Skripsi

KAJIAN BIAYA PENAMBANGAN PER TON BATUBARA DAN PER BCM TANAH PENUTUP PADA TAMBANG BANKO BARAT PIT 3 BARAT PT. BUKIT ASAM (PERSERO), Tbk TANJUNG ENIM, SUMATERA SELATAN

Miranda, Ade - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

Target produksi overburden dan batubara yang telah direncanakan oleh PT. Bukit Asam (Persero) Tbk Tanjung Enim pada bulan September 2013 pada Pit 3 Banko Barat sebesar 720.000 bcm/bulan dan batubara sebesar 300.000 ton/bulan. Permasalahan yang terjadi adalah bagaimana produktivitas alat mekanis untuk pengupasan tanah penutup dan penambangan batubara dan berapakah biaya dari pengupasan tanah penutup per bcm dan biaya dari penambangan batubara per ton. Peralatan mekanis yang digunakan untuk pengupasan lapisan tanah penutup adalah 3 unit bulldozer D 9 R, 6 unit Backhoe 385 C, dan 30 unit DT HD 773 E. Sedangkan peralatan mekanis untuk penambangan batubara adalah 1 unit bulldozer, 2 unit Backhoe 345 D, 11 unit DT Scania P 420, 'Dari hasil kajian ini produksi overburden dan batubara pada bulan September 2013 sebesar 794.080 bcm bcm/bulan dan 196.157 ton/bulan. Total biaya pengupasan tanah penutup (overburden) sebesar Rp. 18.527,00/bcm dan total biaya penambangan batubara sebesar Rp 96.000,00/ton


Availability
Inventory Code Barcode Call Number Location Status
1507001955T141354T1413542015Central Library (References)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1413542015
Publisher
Inderalaya : Prodi Teknik Pertambangan, Fakultas Teknik Universitas Sriwijaya., 2015
Collation
x, O-1 hlm. : ilus. ; tab. ; 28 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.334 07
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Penambangan batubara
Prodi Teknik Pertambangan
Specific Detail Info
-
Statement of Responsibility
DS
Other version/related

No other version available

File Attachment
  • KAJIAN BIAYA PENAMBANGAN PER TON BATUBARA DAN PER BCM TANAH PENUTUP PADA TAMBANG BANKO BARAT PIT 3 BARAT PT. BUKIT ASAM (PERSERO), Tbk TANJUNG ENIM, SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search