The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS FAKTOR PENYEBAB CONTRACT CHANGE ORDER PADA PROYEK KONSTRUKSI DI KOTA PALEMBANG

Skripsi

ANALISIS FAKTOR PENYEBAB CONTRACT CHANGE ORDER PADA PROYEK KONSTRUKSI DI KOTA PALEMBANG

Maharani, Anggita - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

Changes in construction projects frequently occur due to various factors, known as Contract Change Order (CCO). This study aims to identify the factors causing CCO in construction projects in Palembang, analyze its impacts, and formulate mitigation strategies to minimize potential risks. A quantitative research approach was used by distributing questionnaires to respondents consisting of project owners and contractors. Data analysis was conducted using the Guttman Scale and Relative Importance Index (RII). The results indicate that the main causes of CCO include design changes, planning errors, site conditions that do not match the initial plans, and administrative constraints. The impacts include project delays, increased costs, and potential conflicts between stakeholders. To mitigate these impacts, this study recommends more thorough planning, improved communication between project owners and contractors, and the implementation of stricter project management systems.


Availability
Inventory Code Barcode Call Number Location Status
2507002134T170306T1703062025Central Library (Reference)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1703062025
Publisher
Indralaya : Prodi Teknik Sipil, Fakultas Teknik Universitas Sriwijaya., 2025
Collation
xx, 152 hlm.; ilus.; tab.; 29 cm.
Language
Indonesia
ISBN/ISSN
-
Classification
624.07
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Teknik Sipil--Proyek Kontruksi
Specific Detail Info
-
Statement of Responsibility
MI
Other version/related

No other version available

File Attachment
  • ANALISIS FAKTOR PENYEBAB CONTRACT CHANGE ORDER PADA PROYEK KONSTRUKSI DI KOTA PALEMBANG
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search