The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of PERENCANAAN SQUEEZE CEMENTING METODE BALANCE PLUG PADA SUMUR “X” DAN SUMUR “Y” DI LAPANGAN OGAN PT.PERTAMINA EP ASSET 2 PRABUMULIH

Skripsi

PERENCANAAN SQUEEZE CEMENTING METODE BALANCE PLUG PADA SUMUR “X” DAN SUMUR “Y” DI LAPANGAN OGAN PT.PERTAMINA EP ASSET 2 PRABUMULIH

Prasetyo, Eko - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

Squeeze cementing is re-cementing which is performed as one step of well treatment, by placing the cement slurry with relatively little volume at the desired position to tackle the problem at the well. One of the problems that can be solved well with the cementing squeeze close the perforation zone. Squeeze cementing methods used in the study is balance plug method. The research was conducted on the wells X and Y by means of collecting the data well, perform data processing which includes calculation cementing design, planning cementing procedures, test results by performing tag cement and compressive strength test. The injectivity test performed that well X has a loss, and it needs to re-design cementing because cementing plan that has been made can not be applied. The results obtained redesign that semen volume must be increased, from 6.258 barrels to 8.38 barrels. While wells Y in normal and cementing design that has been created can be applied to the wells. At the wells Y carried hesitation with 1,000 psi, whereas in wells X hesitation is not applied. After Waiting on cement, has been done, the results of estimating tag cement slurry entering perforation zone at well X is about 1.47 barrels and wells Y as much as 1.77 barrels. While the compressive strength test on cement is done by applying pressure of 600 psi for 10 minutes, the results of the compressive strength test shows no pressure drop, which means the pressure is not leaking cementing results. It can be concluded that squeeze cementing has successfiilly closed wells perforated zone at wells X and Y.


Availability
Inventory Code Barcode Call Number Location Status
1407003712T141186T1411862014Central Library (References)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1411862014
Publisher
Indralaya : Prodi Teknik Pertambangan, Fakultas Teknik Universitas Sriwijaya., 2014
Collation
xv, 61 hlm. : ilus. ; tab. 28 cm
Language
Indonesia
ISBN/ISSN
-
Classification
665.533 07
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Metode Balance Plug
Specific Detail Info
-
Statement of Responsibility
DS
Other version/related

No other version available

File Attachment
  • PERENCANAAN SQUEEZE CEMENTING METODE BALANCE PLUG PADA SUMUR “X” DAN SUMUR “Y” DI LAPANGAN OGAN PT.PERTAMINA EP ASSET 2 PRABUMULIH
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search