The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS BIAYA PENGADAAN MATERIAL PADA PEKERJAAN STRUKTUR PROYEK GEDUNG PENGADILAN TINGGI TATA USAHA NEGARA PALEMBANG

Skripsi

ANALISIS BIAYA PENGADAAN MATERIAL PADA PEKERJAAN STRUKTUR PROYEK GEDUNG PENGADILAN TINGGI TATA USAHA NEGARA PALEMBANG

Asditsi, Salsabila - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

Material procurement in construction projects in Palembang requires efficient management to optimize costs and ensure the smooth running of the project. The application of Material Requirement Planning (MRP) with lot sizing techniques such as Lot For Lot (LFL) and Period Order Quantity (POQ) helps manage inventory, reduce storage costs, and handle changes in material demand. This research was conducted at the State Administrative High Court Building Construction project in Palembang. The data used includes primary data such as AHSP, time schedule, RAB, material and wage prices, and BOQ, and secondary data in the form of literature on material management and MRP methods. Data processing includes calculation of procurement costs, analysis of material requirements, and calculation of optimal costs with LFL and POQ techniques. Compared to POQ, the LFL technique results in lower storage costs because the materials ordered are adjusted to daily needs, so storage costs are zero. Although LFL has higher ordering costs, combining it with storage costs still results in lower total material procurement costs. Based on the analysis of material procurement costs using the MRP method and two lot sizing techniques (LFL and POQ) on the Palembang Administrative High Court Building project, LFL results in lower costs, namely Rp 2,048,305,562, due to ordering according to needs and reducing storage costs. POQ, with a cost of Rp 2,083,950,799 increases the cost of storing and tying up capital, although it reduces the frequency of ordering.


Availability
Inventory Code Barcode Call Number Location Status
2507001490T168834T1688342025Central Library (Reference)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1688342025
Publisher
Indralaya : Prodi Teknik Sipil dan Perencanaan, Fakultas Teknik Universitas Sriwijaya., 2025
Collation
xvi, 154 hlm.; ilus.; tab.; 29 cm.
Language
Indonesia
ISBN/ISSN
-
Classification
725.107
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Arsitektur gedung pemerintahan
Specific Detail Info
-
Statement of Responsibility
MI
Other version/related

No other version available

File Attachment
  • ANALISIS BIAYA PENGADAAN MATERIAL PADA PEKERJAAN STRUKTUR PROYEK GEDUNG PENGADILAN TINGGI TATA USAHA NEGARA PALEMBANG
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search