The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PEKERJAAN BETON PADA PROYEK BENDUNGAN TIGA DIHAJI PAKET II DI KABUPATEN OKU SELATAN

Skripsi

ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PEKERJAAN BETON PADA PROYEK BENDUNGAN TIGA DIHAJI PAKET II DI KABUPATEN OKU SELATAN

Wijayanti, Puspita Rahma - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

Delays in construction projects can lead to increased costs, reduced work quality, and potential safety risks. The Tiga Dihaji Dam project in OKU Selatan Regency, particularly in Package II, has experienced significant delays in concrete work. This study aims to analyze the dominant factors contributing to these delays and propose solutions to address the issue. The research method includes distributing questionnaires using the Likert scale to 40 respondents, consisting of contractors and consultants, along with the application of the probability sampling technique to ensure respondent selection. Additionally, field observations were conducted to obtain supplementary data that support the research analysis. The findings identify five dominant factors causing delays in concrete work: late material delivery, land acquisition issues, variations in soil conditions, the impact of the rainy season, and material shortages in the market. To mitigate these issues, several solutions can be implemented, including improving transportation infrastructure and supplier communication, extending contracts and adopting a social approach to land acquisition, developing effective soil condition management strategies, optimizing work schedules during the dry season, and enhancing material procurement planning. This research is expected to contribute to construction project management, particularly in planning, resource management, and risk mitigation strategies for delays in concrete work on dam projects.


Availability
Inventory Code Barcode Call Number Location Status
2507001489T168766T1687662025Central Library (Reference)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1687662025
Publisher
Indralaya : Prodi Teknik Sipil dan Perencanaan, Fakultas Teknik Universitas Sriwijaya., 2025
Collation
xvii, 108 hlm.; ilus.; tab.; 29 cm.
Language
Indonesia
ISBN/ISSN
-
Classification
627.807
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Proyek Bendungan
Specific Detail Info
-
Statement of Responsibility
MI
Other version/related

No other version available

File Attachment
  • ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PEKERJAAN BETON PADA PROYEK BENDUNGAN TIGA DIHAJI PAKET II DI KABUPATEN OKU SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search