The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of OPTIMALISASI PRODUKSI BATU SILIKA BUKIT KARANG PUTIH DAN BUKIT NGALAU BERDASARKAN TARGET PRODUKSI BATU SILIKA PADA PT. SEMEN PADANG DI PADANG SUMATERA BARAT

Skripsi

OPTIMALISASI PRODUKSI BATU SILIKA BUKIT KARANG PUTIH DAN BUKIT NGALAU BERDASARKAN TARGET PRODUKSI BATU SILIKA PADA PT. SEMEN PADANG DI PADANG SUMATERA BARAT

Pala, Afdhal - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

Penambangan silika di PT. Semen Padang menerapkan sistem tambang terbuka. Penambangan menggunakan single handling dan double handling. Alat-alat yang digunakan antara lain motor grader, bulldozer (dozing dan ripping), hydraulic excavator dan dump truck. Kegiatan penambangan silika dilakukan di dua lokasi, Bukit Karang Putih dan Bukit Ngalau. Target produksi silika tahun 2012 adalah 916.003,13 ton. Penambangan silika di masing-masing lokasi melebihi target produksi. Target produksi di Bukit Karang Putih adalah 549.601,88 ton dengan produktivitas nyata 2.477.732,40 ton. Target produksi di Bukit Ngalau adalah 366.401,25 ton dengan produktivitas nyata 427.067,52 ton. Optimalisasi penambangan silika akan dilakukan pengurangan jumlah dump truck, namun tetap dapat memenuhi kebutuhan silika PT. Semen Padang selama tahun 2012. Penambangan di Bukit Karang Putih menggunakan satu unit dump truck Komatsu HD 785-7 akan menghasilkan silika 825.910,80 ton. Penambangan di Bukit Ngalau menggunakan satu unit dump truck Mitsubishi FN 527 MS akan menghasilkan silika 106.766,88 ton. Total produksi silika setelah dilakukan pengurangan jumlah dump truck adalah 932.677,68 ton.


Availability
Inventory Code Barcode Call Number Location Status
1207001831T141392T1413922012Central Library (References)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1413922012
Publisher
Indralaya : Prodi Teknik Pertambangan, Fakultas Teknik Universitas Sriwijaya., 2012
Collation
ix, E-14 hlm. : ilus. ; tab. ; 28 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.07
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Teknik Pertambangan-Batu Silika
Specific Detail Info
-
Statement of Responsibility
DS
Other version/related

No other version available

File Attachment
  • OPTIMALISASI PRODUKSI BATU SILIKA BUKIT KARANG PUTIH DAN BUKIT NGALAU BERDASARKAN TARGET PRODUKSI BATU SILIKA PADA PT. SEMEN PADANG DI PADANG SUMATERA BARAT
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search