The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS DESAIN POMPA ESP PADA SUMUR GLX DI PT PERTAMINA HULU ROKAN REGIONAL 1 ZONA 4 FIELD PRABUMULIH, SUMATERA SELATAN

Skripsi

ANALISIS DESAIN POMPA ESP PADA SUMUR GLX DI PT PERTAMINA HULU ROKAN REGIONAL 1 ZONA 4 FIELD PRABUMULIH, SUMATERA SELATAN

Zahra, Detalia - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT. Pertamina is one of the State-Owned Enterprises engaged in the oil and gas sector. One of the branches of PT Pertamina that is the place of research is located in Prabumulih City, South Sumatra Province. The study was conducted to analyze the design of ESP pumps in the GLX Well. The stages carried out for the design analysis of the ESP pump consist of 2 parts. The first stage is to analyze the production capability of the GLX well, where the main parameter needed in the design of the ESP pump is the optimal production rate of the well (Qopt). The second stage is the analysis of the ESP pump design with the Qopt target. The parameters of the ESP pump design analysis include pump setting depth, pump intake pressure, gas separator and advance gas handler requirements, ESP pump performance, electric motor performance, electric cable performance, switchboard and transformer performance. The results of the analysis that have been carried out have obtained a Qopt of 180.96 bfpd. In order to produce Qopt, it can be used with the ESP IND280 pump, where the number of stages is 236. ESP pumps require a shroud-mounted gas separator and do not require an advance gas handler (AGH). In order for the ESP IND280 pump to operate properly, the equipment components that must be used are the 540 series electric motor, the #2 series CU- #1/0 AL electric cable, the DFH-2 switchboard size, type 72, size 2 and the 26 KVA transformer.


Availability
Inventory Code Barcode Call Number Location Status
2507001135T167526T1675262025Central Library (REFERENCES)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1675262025
Publisher
Indralaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2025
Collation
xv, 56 hlm.; ill.; tab.; 29 cm.
Language
Indonesia
ISBN/ISSN
-
Classification
622.07
Content Type
-
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Teknik Tambang
Prodi Teknik Pertambangan
Specific Detail Info
-
Statement of Responsibility
TUTI
Other version/related

No other version available

File Attachment
  • ANALISIS DESAIN POMPA ESP PADA SUMUR GLX DI PT PERTAMINA HULU ROKAN REGIONAL 1 ZONA 4 FIELD PRABUMULIH, SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search