The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS PERBANDINGAN UNIT COST PENGUPASAN OVERBURDEN DI PIT 3 (SWAKELOLA) DAN PIT TSBC (NON-SWAKELOLA) DI PT BUKIT ASAM TBK. TANJUNG ENIM, SUMATERA SELATAN.

Skripsi

ANALISIS PERBANDINGAN UNIT COST PENGUPASAN OVERBURDEN DI PIT 3 (SWAKELOLA) DAN PIT TSBC (NON-SWAKELOLA) DI PT BUKIT ASAM TBK. TANJUNG ENIM, SUMATERA SELATAN.

Nugraha, Egio Habibie - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT Bukit Asam as owener does mining it self at they mining business permit area or called self-management method, apart from that PT Bukit Asam Tbk. also made several agreements with various contractors, one of them is PT PAMA PERSADA or called non self-management method. Rental agreement made by PT Bukit Asam Tbk. and PT PAMA PERSADA using SPPH 10360 and SPPH 13025 contract. PT Bukit Asam as the self-management party in order to fulfill overburden production targets, then make an investment by purchasing equipment. This research was conducted to determine the unit cost of stripping overburden in pit 3 of Banko Barat Mining and in the Townsite Basecamp pit of Air Laya Mining, as well as to determine the comparison of the unit cost of overburden stripping carried out in pit 3 (self-managed) and in the Townsite Basecamp pit (non-self-managed). Based on analysis and processing carried out using Microsoft Excel 2013, the results obtained were that the unit cost of overburden stripping in pit 3 was18.393,84 IDR/BCM and in TSBC pit was 48.000 IDR/BCM, and a ratio of 1 : 2.6 (one to two point six) which means that overburden stripping in pit 3 using the self-managed method costs less than in the TSBC pit using the non-self-managed method.


Availability
Inventory Code Barcode Call Number Location Status
2407001431T140167T1401672024Central Library (Referens)Available
Detail Information
Series Title
-
Call Number
T1401672024
Publisher
Indralaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2024
Collation
xiv, 33 hlm.; Ilus.; 29 cm Prodi
Language
Indonesia
ISBN/ISSN
-
Classification
622.107
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Eksploitasi, Eksplorasi
Specific Detail Info
-
Statement of Responsibility
MURZ
Other version/related

No other version available

File Attachment
  • ANALISIS PERBANDINGAN UNIT COST PENGUPASAN OVERBURDEN DI PIT 3 (SWAKELOLA) DAN PIT TSBC (NON-SWAKELOLA) DI PT BUKIT ASAM TBK. TANJUNG ENIM, SUMATERA SELATAN. 
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search