Image of PERENCANAAN SEQUENCE PENAMBANGAAN BATUBARA TRIWULAN 1-4 TAHUN 2024 UNTUK MEMENUHI TARGET PRODUKSI 1.000.000 TON PIT KUNGKILAN PT LANGGENG DAYA AGRINDO DI LOKASI IUP PT BUDI GEMA GEMPITA, LAHAT, SUMATERA SELATAN.

Skripsi

PERENCANAAN SEQUENCE PENAMBANGAAN BATUBARA TRIWULAN 1-4 TAHUN 2024 UNTUK MEMENUHI TARGET PRODUKSI 1.000.000 TON PIT KUNGKILAN PT LANGGENG DAYA AGRINDO DI LOKASI IUP PT BUDI GEMA GEMPITA, LAHAT, SUMATERA SELATAN.

Rosalina, Rahma - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT Langgeng Daya Agrindo is a mining contractor company operating in the IUP location of PT Budi Gema Gempita. In Muara Lawai Village, East Merapi, Lahat, South Sumatra. The pit managed by PT Langgeng Daya Agrindo is the kungkilan pit. In 2024 PT Langgeng Daya Agrindo set a coal production target of 1,000,000 tons with a maximum SR of 6 bcm/ton. A mining plan was made to support the predetermined production target. From the design made for the 2024 final pit, the amount of coal obtained is 1,009,522.44 tons and overburden of 5,752,235.57 bcm with SR 5.7 bcm/ton. In quarter 1, coal 224,357.66 tons and overburden 759,955.04 with SR 3.11 bcm/ton were obtained, quarter 2 coal 252,503.03 tons and overburden 1,125. 244.14 with SR 4.46 bcm/ton, quarter 3 obtained coal 255,589.34 tons and overburden 1,933,885.02 with SR 7.57 bcm/ton, and quarter 4 obtained coal 257,072.41 tons and overburden 1,933,151.37 with SR 7.52 bcm/ton. Tool planning in quarter 1 requires 1 fleet in January and an additional 1 fleet in February and March for overburden and 1 fleet for coal. Quarter 2 Requires 2 fleets in April May and an additional 1 fleet in June for overburden and 2 coal fleets. Quarter 3 Requires 3 fleets for overburden and 2 coal fleets. Quarter 4 Requires 3 fleets in October and an additional 1 fleet in November and December for overburden and 2 coal fleets.


Availability
Inventory Code Barcode Call Number Location Status
2407000687T138125T1381252024Central Library (Referens)Available
Detail Information
Series Title
-
Call Number
T1381252024
Publisher
Indralaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2023
Collation
xiv, 48 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.607
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Sistem Transportasi di Pertambangan
Specific Detail Info
-
Statement of Responsibility
MURZ
Other version/related

No other version available

File Attachment
  • PERENCANAAN SEQUENCE PENAMBANGAAN BATUBARA TRIWULAN 1-4 TAHUN 2024 UNTUK MEMENUHI TARGET PRODUKSI 1.000.000 TON PIT KUNGKILAN PT LANGGENG DAYA AGRINDO DI LOKASI IUP PT BUDI GEMA GEMPITA, LAHAT, SUMATERA SELATAN.
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search