The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of REDESAIN PIT LILY DENGAN SEAM L1 TAHUN 2023 DEPARTEMEN BINTANG, PT KALTIM PRIMA COAL, SANGATTA, KALIMANTAN TIMUR

Skripsi

REDESAIN PIT LILY DENGAN SEAM L1 TAHUN 2023 DEPARTEMEN BINTANG, PT KALTIM PRIMA COAL, SANGATTA, KALIMANTAN TIMUR

Farezi, Raihan - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT Kaltim Prima Coal (PT KPC) is one of the largest coal mining companies in Indonesia that applies the open pit method to its coal mining activities. In 2023 with the rising trend of coal prices which continues to increase, the target of production operations in 2023 at PT Kaltim Prima Coal continues to increase, one of the mining departments of PT KPC, namely the bintang department, is trying to maximize the potential of its pit, namely pit Lily where the current actualization of pit Lily has Seam L2, in the geological model below seam L2 itself there is seam L1, from this we will optimize pit Lily down to seam L1. The redesain is carried out using the trial and error method using the application, Geovia Minex 6.4.2 in the form of primary and secondary data as well as with the conditions that have been determined according to the needs of the optimization of the mine pit design itself. Optimization Results for pit Lily are designed with Seam L1 with the highest elevation at RL 280 and lowest point at RL 240, with a road design of +-610m to prime dump from elevation RL280 to RL240 with a maximum grade of 8%. The tonnage of coal in the Lily pit is 85.964 Ton with an average coal calorie value of 6,021 on seams L2 and L1, while the OB volume is 1,234.027 BCM with an SR of 14.4. With the total results obtained from all of pit lily is 165,255 Ton coal with an OB volume of 2,767,727 BCM with a total SR value of 16.75. It is estimated that Lily's pit will be completed in 3 months using a HITACHI EX3600B digger for overburden with dip down mining pattern.


Availability
Inventory Code Barcode Call Number Location Status
2407000953T139481T1394812024Central Library (Referens)Available
Detail Information
Series Title
-
Call Number
T1394812024
Publisher
Indralaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2024
Collation
xv, 43hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.107
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Eksploitasi, Eksplorasi
Specific Detail Info
-
Statement of Responsibility
MURZ
Other version/related

No other version available

File Attachment
  • REDESAIN PIT LILY DENGAN SEAM L1 TAHUN 2023 DEPARTEMEN BINTANG, PT KALTIM PRIMA COAL, SANGATTA, KALIMANTAN TIMUR
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search