Image of ANALISIS MEAN TIME BETWEEN FAILURE UNTUK MENINGKATKAN PRODUKSI MINEGEM 30 KTPD PADA TAMBANG BAWAH TANAH DOZ PT. FREEPORT INDONESIA

Skripsi

ANALISIS MEAN TIME BETWEEN FAILURE UNTUK MENINGKATKAN PRODUKSI MINEGEM 30 KTPD PADA TAMBANG BAWAH TANAH DOZ PT. FREEPORT INDONESIA

Ofsir, Herbert Helmy - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

Underground mining Deep Ore Zone (DOZ) currently has the challenge of handling the wet muck.. Wet muck drawpoint is a condition that has a degree of wetness of 8.5% and > 5cm size distribution of the material is less than 30%. Wet muck is dangerous to be produced manually, then the production team uses minegem system (Automated LHD machines) for safety work of a potential spill out. Minegem system is a technology that allows Load Haul Dump (LHD) is operated independently (remote) without operator in the cab for safe operation. Since 2015, DOZ minegem production average per day did not achieve the target 30ktpd. Based on the research, production achievement is affected productivity, physical availability (PA), utilization availability (UA) and total fleet. Failure unplanned (unplanned downtime) is the dominant factor affecting operating LHD time. The more event of unplanned down and duration of the repairs so the less operating time. Results of the study, minimize unplanned down event may reduce some of the reason major factors with method Mean Time Between Failure (MTBF) in order to know the time reliability of Load Haul Dump (LHD) for 24 hours and operating time/shift. Based on actual data, to increase production MTBF 30ktpd require an average of 22 hours/ day, an average operating time of 13.02 hours/day and MTTR can be solved with an average time of 4.5 hours/day.


Availability
Inventory Code Barcode Call Number Location Status
1607002445T140714T1407142016Central Library (REFERENCES)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1407142016
Publisher
Indralaya : Prodi Teknik Pertambangan, Fakultas Teknik Universitas Sriwijaya., 2016
Collation
xiii, 45 hlm.; ill.; tab.; 28 cm.
Language
Indonesia
ISBN/ISSN
-
Classification
622.290 7
Content Type
Text
Media Type
unmediated
Carrier Type
unspecified
Edition
-
Subject(s)
Tambang Bawah Tanah
Prodi Teknik Pertambangan
Specific Detail Info
-
Statement of Responsibility
Furika
Other version/related

No other version available

File Attachment
  • ANALISIS MEAN TIME BETWEEN FAILURE UNTUK MENINGKATKAN PRODUKSI MINEGEM 30 KTPD PADA TAMBANG BAWAH TANAH DOZ PT. FREEPORT INDONESIA
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search