Skripsi
RANCANG BANGUN SISTEM TRASMISI PADA SISTEM PEMBANGKIT LISTRIK TENAGA LISTRIK.
Basically electricity has a very important role in everyday life. As we know, electricity is a primary need for industry, offices, shops and households. In its service, the State Electricity Company (PLN) often encounters problems, so it is not uncommon for it to be disconnected, both for maintenance purposes and for interruptions. To anticipate power outages by state electricity companies such as PLN, people tend to use generator sets (gensets) to anticipate power outages so they can continue their activities. In this study, tests were carried out to prove whether the redesigned transmission system was good by carrying out a loading test of 2600 watts for 10 minutes. When the maximum loading was carried out for 10 minutes with a maximum load of 2600 watts, the COP obtained was 3 , 2, where the COP results obtained have increased from previous studies by rearranging the motor generator pulley and the addition of a flywheel that can operate without experiencing a significant decrease. Keywords : Electrical Energy Power Plant, Motor Drive, Transmission System, Electrical Energy.
Inventory Code | Barcode | Call Number | Location | Status |
---|---|---|---|---|
2307006155 | T129101 | T1291012023 | Central Library (Referens) | Available |
No other version available