The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of EVALUASI KINERJA ALAT GALI MUAT DAN ALAT ANGKUT UNTUK PENINGKATAN PRODUKSI BATUBARA DI PIT 3 TIMUR SITE BANKO TENGAH PT BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN

Skripsi

EVALUASI KINERJA ALAT GALI MUAT DAN ALAT ANGKUT UNTUK PENINGKATAN PRODUKSI BATUBARA DI PIT 3 TIMUR SITE BANKO TENGAH PT BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN

Oktaviansyah, Adhe Reynaldi - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT Bukit Asam Tbk has several contractors responsible for executing mining operations, one of which is PT Banguin Karya Pratama Leistari (BKPL), and PT Puisaka Buimi Transportasi (PBT) as subcontractors performing mining activities at Pit 3 East, Bangko Tengah site, with a production target of 100,000 tons of coal in March. This study aims to analyze the conditions of the mining work area, assess the production capabilities of loading and hauling equipment, and evaluate strategies to improve coal production at Pit 3 East, Bangko Tengah site. Mining is conducted using the open-pit method and employs the shovel and truck system. After calculations, the actual total coal production for the month of March amounted to 78.142,182 tons, achieving a production target of 78,14%. Based on this actual production, it is evident that the established production target has not been met. During coal mining activities, various obstacles were identified, including poor road conditions, ineffective working hours, and a lack of compatibility between loading and hauling equipment. Therefore, an evaluation was conducted regarding road conditions, work efficiency, and compatibility factors. The work efficiency in coal mining was increased from 39% to 47%. After a technical evaluation of coal mining activities, coal production increased from the initial 78.142,182 tons to 124.841,717 tons, achieving a production target of 124,84%, meeting the set production target for the month of March.


Availability
Inventory Code Barcode Call Number Location Status
2307006662T130514T1305142023Central Library (Referens)Available
Detail Information
Series Title
-
Call Number
T1305142023
Publisher
Indralaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2023
Collation
xvii, 61 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.607
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Sistem Transportasi di Pertambangan, Jalan Angkut
Specific Detail Info
-
Statement of Responsibility
MURZ
Other version/related

No other version available

File Attachment
  • EVALUASI KINERJA ALAT GALI MUAT DAN ALAT ANGKUT UNTUK PENINGKATAN PRODUKSI BATUBARA DI PIT 3 TIMUR SITE BANKO TENGAH PT BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN.
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search