The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of KAJIAN TEKNIS PEMINDAHAN LUMPUR PADA SUMP TIMUR PIT SECTION II UNTUK MENYINGKAP BATUBARA LAPISAN 6 DI PT LANGGENG DAYA AGRINDO JOBSITE PT BUDI GEMA GEMPITA, LAHAT, SUMATERA SELATAN.

Skripsi

KAJIAN TEKNIS PEMINDAHAN LUMPUR PADA SUMP TIMUR PIT SECTION II UNTUK MENYINGKAP BATUBARA LAPISAN 6 DI PT LANGGENG DAYA AGRINDO JOBSITE PT BUDI GEMA GEMPITA, LAHAT, SUMATERA SELATAN.

Adani, Hasyyati  - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT Langgeng Daya Agrindo is a mining service provider company in collaboration with PT Budi Gema Gempita, one of the coal mining companies, located in Muara Lawai Village, East Merapi District, Lahat Regency, South Sumatra Province. High rainfall in recent months has caused the formation of temporary sump in the eastern area of pit section II covering coal seam 6 that to be exposed. Process of exposing coal seam 6 is hampered because the pump used for sump drying process cannot move the mud in the sump so that separate activities are needed to move the mud. The purpose of this study is to calculate the estimated volume of mud contained in sump A and sump B, review the technicalities of mud removal, and determine the number of hauling equipment and the length of time for mud removal. Based on calculations using Minescape 5.7 software, the estimated volume of mud contained in sump A is 44,821.96 m3 and sump B is 22,359.11 m3. The removal method used is the conventional method, which is a combination of excavator and articulated dump trucks with mud handling techniques at the sump are blending with clay material and making embankments on the ADT’s vessel using clay material, and using level dump method then laminating with hard material at the disposal. The number of hauling equipment used in sump A is 8 units with a removal time of ±370 hours and 6 units for sump B with a removal time of ±255 hours.


Availability
Inventory Code Barcode Call Number Location Status
2307006444T1311612T1311612023Central Library (Referens)Available
Detail Information
Series Title
-
Call Number
T1311612023
Publisher
Indralaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2023
Collation
xv, 33 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.207
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Teknik Ekskavasi-Tambang Bawah Tanah
Specific Detail Info
-
Statement of Responsibility
MURZ
Other version/related

No other version available

File Attachment
  • KAJIAN TEKNIS PEMINDAHAN LUMPUR PADA SUMP TIMUR PIT SECTION II UNTUK MENYINGKAP BATUBARA LAPISAN 6 DI PT LANGGENG DAYA AGRINDO JOBSITE PT BUDI GEMA GEMPITA, LAHAT, SUMATERA SELATAN.
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search