The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS PRODUKSI ALAT GALI MUAT DAN ALAT ANGKUT UNTUK MENCAPAI TARGET PRODUKSI BATUBARA PADA BULAN FEBRUARI 2023 DI PT BUKIT BARA ALAM LAHAT, SUMATERA SELATAN.

Skripsi

ANALISIS PRODUKSI ALAT GALI MUAT DAN ALAT ANGKUT UNTUK MENCAPAI TARGET PRODUKSI BATUBARA PADA BULAN FEBRUARI 2023 DI PT BUKIT BARA ALAM LAHAT, SUMATERA SELATAN.

Akram, Abdullah Abiyyu - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

Coal production at PT Bukit Bara Alam has not reached the set production target. The coal production target at PT Bukit Bara Alam in January was 65,000 tons, while actual production was 56,570 tons. The failure to achieve coal production targets is caused by many factors, both unavoidable and avoidable factors. The purpose of this research is to analyze the factors that cause non-achievement and the efforts made to achieve the production targets set by PT. Bukit Bara Alam. Based on calculations, the production capacity for loading and digging equipment is 79,596.87 tons and for transportation equipment it is 48,117.19 tons. This means that coal production in February 2023 has not yet reached the production target, namely at 79%. Based on observations, the factors and constraints that influence coal production are road geometry, transport equipment cycle time, and work efficiency. It is known that there are 12 points on 6 road segments that do not meet standards. This affects the high cycle time of transportation equipment. Apart from that, it is also known that work efficiency in February was only 42%. After improvements in road geometry, transport equipment cycle time, and work efficiency, equipment production capabilities have increased. Based on calculations, the production capacity for loading and digging equipment is 101,748.65 tons and for transportation equipment it is 63,676.67 tons, so that the production target has been achieved with a production achievement of 104%.


Availability
Inventory Code Barcode Call Number Location Status
2307006601T131056T1310562023Central Library (Referens)Available
Detail Information
Series Title
-
Call Number
T1310562023
Publisher
Indralaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2023
Collation
xiv, 43 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622,607
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Sistem Transportasi di Pertambangan, Alat Angkut
Specific Detail Info
-
Statement of Responsibility
MURZ
Other version/related

No other version available

File Attachment
  • ANALISIS PRODUKSI ALAT GALI MUAT DAN ALAT ANGKUT UNTUK MENCAPAI TARGET PRODUKSI BATUBARA PADA BULAN FEBRUARI 2023 DI PT BUKIT BARA ALAM LAHAT, SUMATERA SELATAN.
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search