The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of EVALUASI KOORDINASI PROTEKSI RELE ARUS LEBIH DAN GANGGUAN TANAH PADA TRANSFORMATOR 70 KV GARDU INDUK SUNGAI KEDUKAN PENYULANG ARWANA

Skripsi

EVALUASI KOORDINASI PROTEKSI RELE ARUS LEBIH DAN GANGGUAN TANAH PADA TRANSFORMATOR 70 KV GARDU INDUK SUNGAI KEDUKAN PENYULANG ARWANA

Putra, Pribadi Eka - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

In the era of Industry 4.0, electricity demand is crucial in supporting daily life activities. Therefore, the distribution of electrical power to consumers must be reliable and of high quality, especially in terms of handling disturbances. Electrical distribution is not immune to disturbances, particularly short-circuit faults. Thus, coordination of protection relays is necessary to localize faults and protect main equipment in the distribution system. At Sungai Kedukan Substation, protection relays such as Overcurrent Relays are installed to anticipate two-phase short-circuit faults, and Ground Fault Relays are used to anticipate single-phase ground faults. The research began with data collection through field observations at the Sungai Kedukan Substation. Based on calculations, it was found that the two-phase short-circuit current and the single-phase ground fault current at the transformer were 3165,3242 A and 260.6737 A, respectively. At the Arwana feeder, the two-phase short-circuit current and the single-phase ground fault current were 260.6737 A and 260.6737 A, respectively. The setting value of the Overcurrent Relay Time Multiplier Setting (TMS) for the 70 kV side of the transformer was 0.3, and for the 20 kV side was 0.2. The setting value of the Overcurrent Relay TMS at the Arwana feeder was 0.02. The setting value of the Ground Fault Relay TMS for the 70 kV side of the transformer was 0.40, and for the 20 kV side was 0.23. The setting value of the Ground Fault Relay TMS at the Arwana feeder was 0.1.


Availability
Inventory Code Barcode Call Number Location Status
2307006149T129103T1291032023Central Library (Referens)Available
Detail Information
Series Title
-
Call Number
T1291032023
Publisher
Indralaya : Prodi Teknik Elektro, Fakultas Teknik Universitas Sriwijaya ;., 2023
Collation
xi, 52 hlm.; Ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
621.314 07
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Transformator
Prodi Teknik Elektro
Specific Detail Info
-
Statement of Responsibility
MURZ
Other version/related

No other version available

File Attachment
  • EVALUASI KOORDINASI PROTEKSI RELE ARUS LEBIH DAN GANGGUAN TANAH PADA TRANSFORMATOR 70 KV GARDU INDUK SUNGAI KEDUKAN PENYULANG ARWANA
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search