The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS GEOMETRI JALAN TAMBANG UNTUK MENINGKATKAN PRODUKTIVITAS ALAT ANGKUT PADA PENAMBANGAN BATUBARA DI PT BUKIT BARA ALAM, LAHAT, SUMATERA SELATAN.

Skripsi

ANALISIS GEOMETRI JALAN TAMBANG UNTUK MENINGKATKAN PRODUKTIVITAS ALAT ANGKUT PADA PENAMBANGAN BATUBARA DI PT BUKIT BARA ALAM, LAHAT, SUMATERA SELATAN.

Ahmad, ImamĀ  - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

An ideal mine hauling road will optimize production results in accordance with planned production targets. The coal production target at PT Bukit Bara Alam in January and February is 65,000 tons and 61,000 tons, while the actual production is 56,570 tons and 50,819. One of the unattainments is caused by the less than ideal haul road geometry so that the travel time of dump trucks from the mining front to the ROM stock becomes longer. The purpose of this study is to determine the actual dump truck productivity, analyze the comparison of actual haul road geometry conditions with standard haul road geometry, and find out the productivity of dump trucks after repair. Based on the results of the study, a mine hauling road layout design was obtained from the mining front to the ROM stock with 14 segments. The actual haul road geometry has a straight road width between 7-33.6 meters, a bend road width between 7.9-26.4 meters, superelevation between 1.75%-8.75% with a bend radius between 10.213-71.22 meters, a cross slope between 0-5.24%, and a road grade between 0-6.08%. Based on road geometry calculations using AASHTO provisions, there are still many that do not meet the standards. The actual dump truck cycle time (before repair) is 21.74 minutes, while for after repair it is 19.01 minutes. The actual dump truck productivity is 24.327 tons / hour, while after repair it is 27.82 tons / hour. PT Bukit Bara Alam's coal production in March increased from 57,448 tons to 65,698 tons, resulting in a production achievement of 98.05%.


Availability
Inventory Code Barcode Call Number Location Status
2307006762T130702T1307022023Central Library (Referens)Available
Detail Information
Series Title
-
Call Number
T1307022023
Publisher
Indralaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2023
Collation
xv, 49 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.607
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Sistem Transportasi di Pertambangan
Specific Detail Info
-
Statement of Responsibility
MURZ
Other version/related

No other version available

File Attachment
  • ANALISIS GEOMETRI JALAN TAMBANG UNTUK MENINGKATKAN PRODUKTIVITAS ALAT ANGKUT PADA PENAMBANGAN BATUBARA DI PT BUKIT BARA ALAM, LAHAT, SUMATERA SELATAN.
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search