The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of PENERAPAN METODE ALL WEATHER ROAD PADA JALAN POROS HAULING OVERBURDEN PIT ALAM 1-3 UNTUK MENINGKATKAN PRODUCTIVITY CMT 106 DI PT. BINA SARANA SUKSES SITE PT. MUARA ALAM SEJAHTERA KABUPATEN LAHAT SUMATERA SELATAN. 

Skripsi

PENERAPAN METODE ALL WEATHER ROAD PADA JALAN POROS HAULING OVERBURDEN PIT ALAM 1-3 UNTUK MENINGKATKAN PRODUCTIVITY CMT 106 DI PT. BINA SARANA SUKSES SITE PT. MUARA ALAM SEJAHTERA KABUPATEN LAHAT SUMATERA SELATAN. 

Daisiu, Ricky Semuel - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT. Bina Sarana Sukses is a mining company in Indonesia, which operates in the mining and sales of coal commodities. This research aims to increase productivity on overburden hauling roads and determine the minimum value for CMT 106. This research was carried out by analyzing and processing data from in-situ test results and taking actual data in the field. In situ testing carried out in the field is dynamic cone penetrometer (DCP) testing to determine the value of soil density and soil bearing capacity in initial conditions and in conditions after the All Weather Road method is applied. After applying the AWR method to the haul road, the soil density value on all road segments increased. All road segments have a CBR value of ≥50% on both the empty and loaded sides, this shows that the soil resistance value on both sections meets haul road standards. Apart from increasing the CBR value and soil bearing capacity, the application of AWR is also able to increase the speed of the CMT 106, based on the results of direct data collection in the field, it was found that the speed of the CMT 106 increased by 3km/hour both during load travel and empty travel, which increases the speed of the CMT This 106 had a direct impact on the increase in CMT 106 productivity, which was initially 22,678.8 bcm/month, increasing to 28,345.9bcm/month.


Availability
Inventory Code Barcode Call Number Location Status
2307006437T131095T1310952023Central Library (Referens)Available
Detail Information
Series Title
-
Call Number
T1310952023
Publisher
Indralaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2023
Collation
xv, 42 hlm.; ilus.; 29 cm
Language
ISBN/ISSN
-
Classification
622,607
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Sistem Transportasi di Pertambangan
Specific Detail Info
-
Statement of Responsibility
MURZ
Other version/related

No other version available

File Attachment
  • PENERAPAN METODE ALL WEATHER ROAD PADA JALAN POROS HAULING OVERBURDEN PIT ALAM 1-3 UNTUK MENINGKATKAN PRODUCTIVITY CMT 106 DI PT. BINA SARANA SUKSES SITE PT. MUARA ALAM SEJAHTERA KABUPATEN LAHAT SUMATERA SELATAN. 
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search