The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of STUDI IMPLEMENTASI SISTEM DRAINASE VERTIKAL (VERTICAL DRAIN) DALAM UPAYA STABILISASI LERENG TIMBUNAN MUARA TIGA BESAR UTARA UPTE PT BUKIT ASAM (PERSERO) TBK, SUMATERA SELATAN.

Skripsi

STUDI IMPLEMENTASI SISTEM DRAINASE VERTIKAL (VERTICAL DRAIN) DALAM UPAYA STABILISASI LERENG TIMBUNAN MUARA TIGA BESAR UTARA UPTE PT BUKIT ASAM (PERSERO) TBK, SUMATERA SELATAN.

Anugrah, Muhammad Dandy - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

Coal mining activities at PT. Bukit Asam, Tbk uses surface mining system methods and conventional and continuous mining equipment. Open coal mining is strongly influenced by water making slope conditions saturated, where water can have an impact on mining operational activities. High rainfall during the rainy season can affect or hamper ongoing mining operations. The results of observations in the field, Muara Tiga Besar Utara is one of the MTB areas used as a transportation route for hauling vehicles from the front pit of Muara Tiga Besar Utara and there is disposal by the inpit dump method so that it is necessary to maintain the heap slope in the area so as not to cause avalanches due to water. On this basis, an optimal handling effort is needed in dealing with water problems on the slope by conducting a vertical drain implementation study. Based on the results of the study, a consolidation time of 90% was obtained in 6 weeks with prefabricated vertical drain and consolidation time with 90% took 15 years without prefabricated vertical drain. Installation of prefabricated vertical drain in MTBU inpit dump pile in section A-A' with Hinisial 21 meters and Hfinal of 20 meters analysis based on FK recommendations for north side overall slope from elevation -39 to elevation -60 with H = 21 m, bench width = 40 m, slope slope 6.2o, obtained FK = 1.578 (stable) so that the heap slope and landfill base area become solid well consolidated.


Availability
Inventory Code Barcode Call Number Location Status
2307006156T129680T1296802023Central Library (Referens)Available
Detail Information
Series Title
-
Call Number
T1296802023
Publisher
Indralaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2023
Collation
xv, 58 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.507
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
drainase pertambangan
Prodi Teknik Pertambangan
Specific Detail Info
-
Statement of Responsibility
MURZ
Other version/related

No other version available

File Attachment
  • STUDI IMPLEMENTASI SISTEM DRAINASE VERTIKAL (VERTICAL DRAIN) DALAM UPAYA STABILISASI LERENG TIMBUNAN MUARA TIGA BESAR UTARA UPTE PT BUKIT ASAM (PERSERO) TBK, SUMATERA SELATAN.
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search