The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS KETERCAPAIAN PENIMBUNAN OVERBURDEN PADA BULAN JANUARI 2023 DI PIT PANDU PT PUTRA MUBA COAL, SUMATERA SELATAN.

Skripsi

ANALISIS KETERCAPAIAN PENIMBUNAN OVERBURDEN PADA BULAN JANUARI 2023 DI PIT PANDU PT PUTRA MUBA COAL, SUMATERA SELATAN.

Mahmudi, Dhea Iqbal - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

The overburden dumping plan at PT Putra Muba Coal is designed as a monthly sequential dumping plan based on the established disposal design. There is a discrepancy between the dumping plan and its realization in the field, resulting in inconsistencies in both production and overburden dumping. This study aims to determine the achievement of overburden dumping based on the realization of the dumping sequence, the volume of discrepancies that occurred, the contributing factors, and the efforts that can be undertaken. The achievement of overburden dumping and the volume of discrepancies in dumping are analyzed using MineScape 5.7 software by comparing the dumping sequence in January 2023 with the progress of disposal dumping at the end of January 2023. The achievement of overburden dumping based on the realization of the dumping sequence in Pit Pandu in January 2023 is 63.37% of the target of 698,420.44 BCM, which is 442,585.95 BCM, where 374,097.95 BCM is the area in of plan. The analysis results indicate that the causes of discrepancies are the quantity and placement of fleets that do not align with the plan, lower effective working hours than planned, lower equipment productivity than planned, and suboptimal supervision. Several efforts are proposed to minimize these discrepancies, including minimizing the loss time of excavation and hauling equipment, rescheduling excavation equipment, and improving the effective working time of equipment.


Availability
Inventory Code Barcode Call Number Location Status
2307006501T131166T1311662023Central Library (Referens)Available
Detail Information
Series Title
-
Call Number
T1311662023
Publisher
Indralaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2023
Collation
xvii, 36 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
620.006 07
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Manajemen Teknik
Analisis Penimbunan Overburden
Specific Detail Info
-
Statement of Responsibility
MURZ
Other version/related

No other version available

File Attachment
  • ANALISIS KETERCAPAIAN PENIMBUNAN OVERBURDEN PADA BULAN JANUARI 2023 DI PIT PANDU PT PUTRA MUBA COAL, SUMATERA SELATAN.
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search