The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS BENEFIT AND COST RATIO TERHADAP RENCANA KEGIATAN REVEGETASI PADA LAHAN BACKFILL PIT MTBU PT BUKIT ASAM TBK SUMATERA SELATAN

Skripsi

ANALISIS BENEFIT AND COST RATIO TERHADAP RENCANA KEGIATAN REVEGETASI PADA LAHAN BACKFILL PIT MTBU PT BUKIT ASAM TBK SUMATERA SELATAN

Yurenza, Nur Kholis - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

Muara Tiga Besar Utara (MTBU) is one of the longest operating pits at PT Bukit Asam. Most of the pit area is a stockpile area. This is because the overburden material stockpiling in the MTBU pit uses the backfilling method. The backfill land has loose material so that the erosivity of the soil in the backfill land has a large value, as a result the soil particles are carried by runoff water towards the sump and then sedimentation or the formation of mud occurs at the bottom of the sump. This can cause the capacity function of the existing sump to not be optimal due to mud settling at the bottom of the sump. One effort to overcome the amount of mud formed is to carry out revegetation activities. Based on the results of the analysis that has been carried out, the average erosivity of the annual rainfall is 2514.007681 mm/year using rainfall data for the last 10 years (2012-2021). The erodibility of the resulting soil is 0.39 with a slope of 8% to 15% resulting in a slope factor and slope length of 1.4. The land conversion factor on mining land has a value of 1 so that the resulting erosion based on these data is 142,866.64 tons/year and the volume rate of mud formed on the backfill pit MTBU is 58737.014 m3/year with a Specific Gravity (SG) of 1.2. After carrying out revegetation activities on a backfill area of 109 Ha, the amount of erosion decreased to 51431.99 m3/year and mud to 21145.325m3/year. Then, revegetation activities were analyzed economically using Benefit and Cost Ratio Analysis resulting in a B/C value of 2,89 which means the project is feasible to implement.


Availability
Inventory Code Barcode Call Number Location Status
2307004175T114180T1141802023Central Library (Referens)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1141802023
Publisher
Indralaya : Prodi Teknik Pertambangan, Jurusan Teknik Pertambangan dan Geologi, Fakultas Teknik, Universitas Sri., 2023
Collation
viii, 138 hlm.; Ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.0107
Content Type
-
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Batubara
Prodi Teknik Pertambangan
Specific Detail Info
-
Statement of Responsibility
PITRIA
Other version/related

No other version available

File Attachment
  • ANALISIS BENEFIT AND COST RATIO TERHADAP RENCANA KEGIATAN REVEGETASI PADA LAHAN BACKFILL PIT MTBU PT BUKIT ASAM TBK SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search