The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS SISTEM PENYALIRAN TAMBANG PADA AREA OLD DUMP TAL UTARA PT BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN

Skripsi

ANALISIS SISTEM PENYALIRAN TAMBANG PADA AREA OLD DUMP TAL UTARA PT BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN

Pahlevi, Muhammad Ikhsan - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT Bukit Asam is a company engaged in the coal mining industry. The company is located in Tanjung Enim, South Sumatra. The research was conducted because the research area has heavy rainfall and on the north side of the Mahayung North Air Laya Mine (TAL Mahayung) pit is an old dump area. Mining is carried out at the Mahayung TAL pit using the open pit method so that the potential for mud to settle on the sump floor is very high plus runoff water that enters has the potential to inundate the mining front. Mine drainage system analysis is important to prevent problems that occur due to inappropriate mine draina ge system planning. This study plans the construction of an open channel using a geomembrane on the outer North side of the boundary with a length of 1,777.6 m. Analysis of runoff water discharge includes: total runoff water discharge of 12.26 m3/second; runoff water debit served by ring canal of 2.1 m3/second; inpit runoff water discharge of 10.20 m3/second. The actual erosion rate value is 20,920.51 tons/ha/year with a sediment delivery ratio of 0.66 so that a potential sediment rate value of 13,843.9 tons/ha/year is obtained. The results of open canal analysis using manning where obtained recommendations for a trapezoidal cross-section of the open canal and the dimensions of the open canal are as follows: upper length 2.263 m, lower length 0.663 m and channel height 0.96 m. The recommended volume of the holding pond is 250,545.73 m3. The analysis was carried out to obtain pump design discharge and pump requirements, obtained a planned pump discharge of 320 liters/second at 1400 RPM and a pump requirement at the study site of 3 units.


Availability
Inventory Code Barcode Call Number Location Status
2307004247T117250T1172502023Central Library (Referens)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1172502023
Publisher
Indralaya : Prodi Teknik Pertambangan, Jurusan Teknik Pertambangan dan Geologi, Fakultas Teknik, Universitas Sri., 2023
Collation
xvi, 67 hlm.; Ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.0107
Content Type
-
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Batubara
Prodi Teknik Pertambangan
Specific Detail Info
-
Statement of Responsibility
PITRIA
Other version/related

No other version available

File Attachment
  • ANALISIS SISTEM PENYALIRAN TAMBANG PADA AREA OLD DUMP TAL UTARA PT BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search