The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS PENENTUAN NILAI POWDER FACTOR UNTUK PEROLEHAN FRAGMENTASI BATUAN YANG SESUAI DENGAN RENCANA DI PIT E BLOK 7 BMO 2, PT. BERAU COAL

Skripsi

ANALISIS PENENTUAN NILAI POWDER FACTOR UNTUK PEROLEHAN FRAGMENTASI BATUAN YANG SESUAI DENGAN RENCANA DI PIT E BLOK 7 BMO 2, PT. BERAU COAL

Riadi, Shara Evilia - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT. Berau Coal is known as a mining company engaged in the coal industry. In coal production, it is necessary to dismantle overburden by drilling and blasting. The standard of blasting operation in Pit E Blok 7 Binungan Mine Operation 2 is fragmentation ≤50 cm produced more than 60% and powder factor 0,21 kg/bcm. The drilling methods used are single rod and double rod. Based on field observation, the double rod method has powder factor value of 0,27 kg/bcm which did not in accordance as planned. This research aims to analyze powder factor as planned using double rod drilling method by the fragmentation standards set by the proposed blasting geometry. The average blasting geometry is burden 7,75 m, spacing 9 m, stemming 3,8 m, and depth 11,65 m. Distribution of fragmentation for material size ≤50 cm by KUZ-RAM method in area 1 75,31%, area 2 71,59 %, area 3 77,05%, and area 4 70,69% also using wipfrag software in area 1 84,90%, area 2 80,56%, area 3 86,11%, and area 4 80,44%. Powder factor analysis was carried out based on the proposed geometry Theory by ICI-Explosive with the difference of two emulsion products, 0,7 gr/cc and 0,75 gr/cc. According to ICI-Explosive theory with emulsion density 0,7 gr/cc, the result of powder factor is 0,21 kg/cc with blasting geometry burden 8,0 meters, spacing 10,4 meters, stemming 4,0 meters, hole depth 12,0 meters, and sub drilling 0 meters.


Availability
Inventory Code Barcode Call Number Location Status
2307003616T103779T1037792023Central Library (Referens)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1037792023
Publisher
Indralaya : Prodi Teknik Pertambangan, Jurusan Teknik Pertambangan dan Geologi, Fakultas Teknik Universitas Sriw., 2023
Collation
xii, 84 hlm.; Ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.307
Content Type
-
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Jenis Pertambangan Tertentu
Specific Detail Info
-
Statement of Responsibility
PITRIA
Other version/related

No other version available

File Attachment
  • ANALISIS PENENTUAN NILAI POWDER FACTOR UNTUK PEROLEHAN FRAGMENTASI BATUAN YANG SESUAI DENGAN RENCANA DI PIT E BLOK 7 BMO 2, PT. BERAU COAL
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search