Image of KAJIAN PRODUKTIVITAS ALAT ANGKUT UNTUK MEMENUHI TARGET CHAIN FEEDER DI PT. JASA LAKSA UTAMA, LAHAT, SUMATERA SELATAN

Skripsi

KAJIAN PRODUKTIVITAS ALAT ANGKUT UNTUK MEMENUHI TARGET CHAIN FEEDER DI PT. JASA LAKSA UTAMA, LAHAT, SUMATERA SELATAN

Rahmadi, Ahmad Andi - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT. Jasa Laksa Utama (JLU) as maintenance crushing plant contractor company for reducing size of coal unter coordinated of PT. Bara Alam Utama (BAU) as the owner. The production target to be achieved by PT. Jasa Laksa Utama in March for the chain feeder on line 1 which is 145,000 tons/month and for the production target on the chain feeder line 2 which is 175,000 tons/month. However, the actual production in the field for chain feeder line 1 was 132,422 tons/month or reached 91% of the target and production for chain feeder line 2 was 157,883.52 tons/month or achieved 90% of the set production target. This research aims to review and provide appropriate efforts to increase the productivity of the dump truck against the productivity of the chain feeder so that it will be able to achieve the specified target. Based on the results of data processing and analysis, the results of the calculations between the productivity of 1 unit dumptruck on line 1 and 1 unit dumptruck on line 2 to the maximum capacity of the chain feeder it’s found that the chain feeder can accommodate up to 5 units of dumptruck directly in one time. Then it was found that the main factor affecting the unachieved production of chain feeders was work efficiency is too small that is equal to 67% and after being increased by minimizing time constraints that could be avoided, work efficiency increased to 75 % , by improving work efficiency productivity has been reached. Production of coal hauling after experiencing improvement increased to 361,520.11 tons/month , this has exceeded the production target of 320,000 tons/month which is around 113 %.


Availability
Inventory Code Barcode Call Number Location Status
2307005381T125475T1254752023Central Library (Referens)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1254752023
Publisher
Indralaya : Prodi Teknik Pertambangan, Jurusan Teknik Pertambangan dan Geologi, Fakultas Teknik, Universitas Sri., 2023
Collation
xv, 56 hlm.; Ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.607
Content Type
-
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Sistem Transportasi di Pertambangan
Specific Detail Info
-
Statement of Responsibility
PITRIA
Other version/related

No other version available

File Attachment
  • KAJIAN PRODUKTIVITAS ALAT ANGKUT UNTUK MEMENUHI TARGET CHAIN FEEDER DI PT. JASA LAKSA UTAMA, LAHAT, SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search