The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of EVALUASI EFEKTIVITAS PENGGUNAAN HOUR METER ALAT MEKANIS TERHADAP PRODUKSI BATUBARA PADA PIT 1 LUBUK BETUNG PT. BIMA PUTRA ABADI CITRANUSA LAHAT SUMATERA SELATAN

Skripsi

EVALUASI EFEKTIVITAS PENGGUNAAN HOUR METER ALAT MEKANIS TERHADAP PRODUKSI BATUBARA PADA PIT 1 LUBUK BETUNG PT. BIMA PUTRA ABADI CITRANUSA LAHAT SUMATERA SELATAN

Ramadhoni, M. Bintang - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT. BIMA PUTRA ABADI CITRANUSA (BPAC) IS A COMPANY ENGAGED IN THE MINING SECTOR WITH AN AREA OF 286 HECTARES OF IUP EXPLORATION. IN MARCH 2022 THE COAL PRODUCTION TARGET AT PIT 1 LUBUK BETUNG WAS 220,000 TONS, WHILE ONLY 181,768.80 TONS WERE REALIZED WITH A PRODUCTION ACHIEVEMENT OF 83% OF THE TARGETED PRODUCTION TARGET. THIS RESEARCH AIMS TO STRIVE FOR BETTER AND MORE EFFICIENT MINING ACTIVITIES SO THAT THE USE OF HOUR METERS IS BETTER. MINING ACTIVITIES ARE CARRIED OUT USING 1 EXCAVATOR AND 30 DUMP TRUCKS WITH 3 DIFFERENT TYPES. IN EACH MECHANICAL DEVICE UNIT THERE IS AN HOUR METER INSTALLED WITH THE AIM OF MONITORING AND RECORDING THE TIME OF MECHANICAL DEVICE ACTIVITY IN THE FIELD. IN BRICK MINING ACTIVITIES, THERE ARE OBSTACLES THAT MAKE THE USE OF HOUR METERS AND TOTAL PRODUCTION NOT REACH THE TARGET OF THE COMPANY. AFTER REPAIRING THE DELAY TIME, COAL PRODUCTION WHICH WAS PREVIOUSLY 181,768.80 TONS INCREASED TO 205,524.83 TONS. THE TOTAL INCREASE WAS 23,756.03 TONS OF COAL WITH A PRODUCTION LEVEL OF 92%. WITH THE INCREASE IN TOTAL PRODUCTION, THE EFFECTIVENESS OF USING THE HOUR METER HAS ALSO INCREASED FROM ONLY 57% TO 72%. THIS INCREASE GREATLY AFFECTED THE PROFITS OF THE COMPANY WHICH HAD INVESTED ITS ASSETS IN AN HOUR METER TOOL TO MONITOR THE COMPANY'S MECHANICAL EQUIPMENT IN CARRYING OUT MINING ACTIVITIES.


Availability
Inventory Code Barcode Call Number Location Status
2307005334T125319T1253192023Central Library (Referens)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1253192023
Publisher
Indralaya : Prodi Teknik Pertambangan, Jurusan Teknik Pertambangan dan Geologi, Fakultas Teknik, Universitas Sri., 2023
Collation
xiv, 78 hlm.; Ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.307
Content Type
-
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Tambang Batu Bara
Prodi Teknik Pertambangan
Specific Detail Info
-
Statement of Responsibility
PITRIA
Other version/related

No other version available

File Attachment
  • EVALUASI EFEKTIVITAS PENGGUNAAN HOUR METER ALAT MEKANIS TERHADAP PRODUKSI BATUBARA PADA PIT 1 LUBUK BETUNG PT. BIMA PUTRA ABADI CITRANUSA LAHAT SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search