The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of EVALUASI PRODUKTIVITAS ALAT GALI MUAT DOOSAN DX 520 DAN ALAT ANGKUT HINO FM 260 PT. BUMI MERAPI ENERGI, KABUPATEN LAHAT, SUMATERA SELATAN

Skripsi

EVALUASI PRODUKTIVITAS ALAT GALI MUAT DOOSAN DX 520 DAN ALAT ANGKUT HINO FM 260 PT. BUMI MERAPI ENERGI, KABUPATEN LAHAT, SUMATERA SELATAN

Renaldie, Wendy - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

In general, the productivity of mechanical devices is a value that shows the amount of material production that can be done by both loading and transporting equipment in a certain unit of time. The size of the productivity of the loading and digging tool depends on the factors that influence it. Basically, the ability of tools and humans has limits in maximum use because of small obstacles that always occur.one of which is work efficiency Work efficiency is a comparison between productive work time with available work time. With the improvement in work efficiency which was originally 43% to 58%, it caused an increase in productivity from loading and transporting excavations. This increase can occur because equipment production will increase due to reduced loss time that has been minimized so that work efficiency and effective working hours increase. After improvements, the achievement of coal stripping production at the Kungrefinery Pit increased to 53,947 tons / month for the production of loading and digging equipment and 49,566 tons / month for the production of transportation equipment, this means that coal stripping production has exceeded the initial target set by the company which is 85.5%. Based on these results, it can be said that production can be fulfilled, so there is no need for the addition of loading and digging equipment or transportation equipment as well. This can be an evaluation for the company to continue to be able to increase its production targets


Availability
Inventory Code Barcode Call Number Location Status
2307005438T123650T1236502023Central Library (Referens)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1236502023
Publisher
Indralaya : Prodi Teknik Pertambangan, Jurusan Teknik Pertambangan dan Geologi, Fakultas Teknik, Universitas Sri., 2023
Collation
xiii, 74 hlm.; Ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.307
Content Type
-
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Jenis Pertambangan Tertentu
Specific Detail Info
-
Statement of Responsibility
PITRIA
Other version/related

No other version available

File Attachment
  • EVALUASI PRODUKTIVITAS ALAT GALI MUAT DOOSAN DX 520 DAN ALAT ANGKUT HINO FM 260 PT. BUMI MERAPI ENERGI, KABUPATEN LAHAT, SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search