The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of EVALUASI PRODUKTIVITAS COAL HANDLING FACILITY BATUBARA DI PT BUKIT ASAM TBK UNIT DERMAGA KERTAPATI, SUMATERA SELATAN

Skripsi

EVALUASI PRODUKTIVITAS COAL HANDLING FACILITY BATUBARA DI PT BUKIT ASAM TBK UNIT DERMAGA KERTAPATI, SUMATERA SELATAN

Fiorenza, Febiella - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

The coal handling facility process is a stage of unloading/moving coal transported by train for the next production stage to go to the barge. Coal is unloaded and spilled into the Apron feeder, from the Apron feeder to the barge using a belt conveyor. So that the flow of the coal handling facility consists of several equipment units including apron feeders, belt conveyors, magnetic separators, crushers, stackers and also shiploaders. After calculating the aktual productivity of the coal handling facility series system, the productivity of each tool is 584.57 tons/hour (apron feeder), 451.08 tons/hour (belt conveyor), 579.36 tons/hour (double roll crusher), 610 .04 ton/hour (stacker), 766.441 ton/hour (shiploader). Productivity obtained from the coal handling facility is 451.08 tons/hour following the smallest productivity data from the coal handling facility chain system. Based on the results of observations, the failure to achieve coal receiving-unloading was caused by a lack of trains coming to the Kertapati Jetty Unit which resulted in the failure to achieve coal production to barges. Therefore, if the supply of trains coming to PT Bukit Asam Tbk Kertapati Jetty Unit is sufficient or added, production will also increase.


Availability
Inventory Code Barcode Call Number Location Status
2307005558T118872T1188722023Central Library (Referens)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1188722023
Publisher
Indralaya : Prodi Teknik Pertambangan, Jurusan Teknik Pertambangan dan Geologi, Fakultas Teknik, Universitas Sri., 2023
Collation
xv, 69 hlm.; Ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.017
Content Type
-
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Penambangan batubara
Prodi Teknik Pertambangan
Specific Detail Info
-
Statement of Responsibility
PITRIA
Other version/related

No other version available

File Attachment
  • EVALUASI PRODUKTIVITAS COAL HANDLING FACILITY BATUBARA DI PT BUKIT ASAM TBK UNIT DERMAGA KERTAPATI, SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search