The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISA PENYETELAN RELE GANGGUAN TANAH (GFR) DENGAN GANGGUAN HUBUNG SINGKAT SATU FASA KE TANAH PADA PENYULANG BALI DAN PAPUA DI GARDU INDUK KERAMASAN

Skripsi

ANALISA PENYETELAN RELE GANGGUAN TANAH (GFR) DENGAN GANGGUAN HUBUNG SINGKAT SATU FASA KE TANAH PADA PENYULANG BALI DAN PAPUA DI GARDU INDUK KERAMASAN

Wulandari, Putri - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

The 20 kV distribution system often experiences short circuits disruptions due to external factors, which necessitate reliable operation of protective relays to respond appropriately. Based on monthly recorded data, short circuit disruptions have occurred in the Bali and Papua feeders at the Keramasan Main Substation. To identify the causes of these disruptions, the author conducted an analysis of phase-to-ground short circuits using a calculation method for short circuit values, which is used for relay protection reconfiguration. Therefore, the author discusses the analysis of Ground Fault Relay (GFR) settings for single-phase-to-ground short circuits in the Bali and Papua feeders at the Keramasan Main Substation. From the calculation results obtained with a short circuit value of 262,947776 A on the 70 kV transformer side that supplies the feeders, the short circuit value on the incoming 20 kV side is 262,947776 A, the short circuit value for the Bali feeder is 226,6241254 A, and the short circuit value for the Papua feeder is 242,1608267 A. These values are then used for the calculation of the GFR relay protection settings using inverse time low setting. The calculated settings are as follows: for the 70 kV transformer side, a setting value of 7,51279786 A with a Time Multiplier Setting (TMS) of 0.40; for the incoming 20 kV side, a setting value of 26,29479435 A with a TMS of 0.23; for the Bali feeder, a setting value of 22,610079 A with a TMS of 0.1; and for the Papua feeder, a setting value of 24,049188 A with a TMS of 0.1


Availability
Inventory Code Barcode Call Number Location Status
2307004162T116331T1163312023Central Library (Referens)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1163312023
Publisher
Indralaya : Jurusan Teknik Teknik Elektro, Fakultas Teknik, Universitas Sriwijaya., 2023
Collation
xivv, 50 hlm.; Ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
620.009 207
Content Type
-
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Jurusan Teknik Elektro
Ahli Teknologi
Specific Detail Info
-
Statement of Responsibility
PITRIA
Other version/related

No other version available

File Attachment
  • ANALISA PENYETELAN RELE GANGGUAN TANAH (GFR) DENGAN GANGGUAN HUBUNG SINGKAT SATU FASA KE TANAH PADA PENYULANG BALI DAN PAPUA DI GARDU INDUK KERAMASAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search