The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS PERENCANAAN ALTERNATIF PONDASI COOLING TOWER PADA INSTALASI PEMBANGKIT LISTRIK BATUBARA PT. PUSRI PALEMBANG

Skripsi

ANALISIS PERENCANAAN ALTERNATIF PONDASI COOLING TOWER PADA INSTALASI PEMBANGKIT LISTRIK BATUBARA PT. PUSRI PALEMBANG

Bahri, Sarah Humairoh - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT. Pusri is such as the first fertilizer company in Indonesia and PT. Pusri has the biggest asset and also spread around Indonesia. PT. Pusri developing their performance by building a new factory that called as pabrik pusri II-B. In this factory there is Steam Turbine Generator (STG) and Boiler project. One of the existing construction in this project is Cooling Tower. Cooling tower has a fiinction for decreasing water flow temperature that come ffom boiler. The first step that we will do when we build cooling tower is making a foundation then continued by making the upper structure. Foundation is one of the important thing because it has to forwarding the load of its structure above to the subsoil below. The purpose of this study is determining the load of every column on cooling tower structure, planning altemative foundation of cooling tower and calculate safety controPs foundation. The foundation used is spun pile with rectangular shape in size 30 cm x 30 cm x 24 m. Carrying capacity method that used for planning spun pile foundation in this study is carrying capacity method with static analytical formula and the result of NSPT test. Based on the result of SAP2000’s calculation obtained Ptotal = 69745,51 kN. The smallest carrying capacity of the permission (Qall) is 613,525 kN using Qs with a = 1654,604 kN and Qb = 191,684 kN and also the biggest Qall is come from the result of NSPT test = 1040,209 kN. The number of piles that used is 132 piles with the distance between pile = 2,5 m. The efficiency of the pile (Eg) is 0.864 and the carrying capacity of the pile group (Qg) = 200194.9 kN. From the calculation result, the foundation altemative is declared safe to support the construction of cooling tower.


Availability
Inventory Code Barcode Call Number Location Status
1707003051T113522T1135222016Central Library (REFERENCES)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1135222016
Publisher
Inderalaya : Prodi Teknik Sipil, Fakultas Teknik Universitas Sriwijaya., 2016
Collation
xviii, 91 hlm.; ill.; tab.; 28 cm.
Language
Indonesia
ISBN/ISSN
-
Classification
625.107
Content Type
Text
Media Type
unmediated
Carrier Type
unspecified
Edition
-
Subject(s)
Prodi Teknik Sipil
Pondasi, pabrik
Specific Detail Info
-
Statement of Responsibility
Furika
Other version/related

No other version available

File Attachment
  • ANALISIS PERENCANAAN ALTERNATIF PONDASI COOLING TOWER PADA INSTALASI PEMBANGKIT LISTRIK BATUBARA PT. PUSRI PALEMBANG
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search