The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS KETIDAKTERCAPAIAN DAN UPAYA MEMENUHI TARGET PRODUKTIVITAS EXCAVATOR PC-3000 DI PIT 2 BANKO BARAT PT BUKIT ASAM, TBK. TANJUNG ENIM SUMATERA SELATAN

Text

ANALISIS KETIDAKTERCAPAIAN DAN UPAYA MEMENUHI TARGET PRODUKTIVITAS EXCAVATOR PC-3000 DI PIT 2 BANKO BARAT PT BUKIT ASAM, TBK. TANJUNG ENIM SUMATERA SELATAN

Dika, M. Septian Rachman - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT Bukit Asam Tbk is a coal company located in South Sumatra. The province of South Sumatra saves considerable energy resources, one of which is coal which is located in PT Bukit Asam Tbk. The soil scattering method used at PT Bukit Asam Tbk is the blasting method. Blasting is one of the parameters that need to be analyzed to evaluate the productivity of the digging tool, besides that there are other parameters that affect the productivity of the digging tool, namely the digging cycle time and the work efficiency of the digging tool. This analysis needs to be carried out in line with the target data for the productivity of overburden stripping activities in Pit 2 West Bangko in June 2020 which did not reach the target, which was 1,679,034.52 BCM/month from the target of 2,000,000 BCM/month with an achievement percentage of 83, 95%. After analyzing based on the data obtained, the productivity of the digging tool in July 2020 was 1,769,183.15 BCM/Month and with an average cycle time of 29.33 seconds with a percentage value of about 88.45%. . And for the percentage of distribution of bolts that can be said to be boulder or > 100 cm by 3.45%, it means that it still meets the criteria for good fragmentation. The distribution of rock fragmentation after blasting does not have much influence on the productivity of the PC-3000 shovel digging tool. While the factors that affect productivity are the efficiency of the PC-3000 shovel digging tool from 66.33% to 76.75%, weather and front conditions, and lack of supervision, which exceeds company standards.


Availability
Inventory Code Barcode Call Number Location Status
2307001318T91294T912942023Central Library (Referens)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T912942023
Publisher
Inderalaya : Prodi Teknik Sipil, Fakultas Teknik Universitas Sriwijaya., 2023
Collation
xiv, 44 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.607
Content Type
-
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Sistem Transportasi di Pertambangan
Specific Detail Info
-
Statement of Responsibility
SEPTA
Other version/related

No other version available

File Attachment
  • ANALISIS KETIDAKTERCAPAIAN DAN UPAYA MEMENUHI TARGET PRODUKTIVITAS EXCAVATOR PC-3000 DI PIT 2 BANKO BARAT PT BUKIT ASAM, TBK. TANJUNG ENIM SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search